AD/PA-18/9 - Fuel Management Placards - Installation
1AD/PA-18/9 - Fuel Management Placards - Installation
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/PA-18/9 - Fuel Management Placards - Installation.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Piper PA-18 and 19 (Super Cub) Series Aeroplanes
AD/PA-18/9 Fuel Management Placards - Installation 9/77
Applicability: All models certificated in Agricultural and Normal/Agricultural categories. Requirement: 1. Install a placard adjacent to the fuel selector redesignating the Left Tank as the
Main Tank and the Right Tank as the Auxiliary Tank.
- Install the following placard on the instrument panel:
“FOR ALL AGRICULTURAL OPERATIONS USE THE MAIN FUEL TANK ONLY”
Compliance: Within 100 hours time in service after 30 September 1977.