Partenavia P68 Series Aeroplanes
Partenavia P68 Series Aeroplanes
| AD/P68/5 | Circuit Breaker Installation - Inspection | 9/2008 |
|---|
| Requirement: | CANCELLED. |
|---|---|
| This AD is cancelled on 28 August 2008. | |
| Background: | This unique Australian AD specified once-only inspection of circuit breakers to ensure they were connected to the nominated services. The AD was raised in response to a defect found in an Australian aircraft. Compliance was required within 100 hours time in service after May 1977. The AD is no longer required. |
View image in the official source
James Coyne
Delegate of the Civil Aviation Safety Authority
16 July 2008