What it does
This is Airworthiness Directive AD/MU-2/65 Amdt 1, issued by the Civil Aviation Safety Authority (CASA) on 28 February 2007, effective 9 March 2007. It mandates inspection, repair, replacement, adjustment and a ground check of the engine torque indication system on certain Mitsubishi MU-2 series aeroplanes. The directive is an amendment to an earlier Directive that became effective on 10 March 1999. The core mechanical change is the addition of a ground check of the engines (Requirement 3) following the inclusion of a Power Assurance Chart in the Aircraft Flight Manual (AFM), as referenced in Note 1 which requires the AFM to be amended to the current approved revision under Civil Aviation Regulation 55. The background states that Mitsubishi Heavy Industries (MHI) reported some torque transmitters or transducers significantly out of calibration, which could cause an actual power mismatch not indicated on instruments, potentially degrading performance or handling qualities. The original Directive required inspection and, if necessary, repair, replacement or calibration. This amendment adds a post-inspection ground run to verify engine performance against the Power Assurance Chart. In economic terms, this imposes a recurring compliance cost on operators: each aircraft affected must be taken out of service within 100 hours time in service (TIS) after 9 March 2007 for the inspections, and any corrective action must be done before further flight. The ground check adds a further 100-hour interval requirement. There is no sunset or recurring interval stated - the compliance is one-off after the effective date, but the requirement to repair discrepancies noted during inspection is before further flight. The directive does not specify a recurrent compliance interval for ongoing checks; it is a one-time action triggered by the effective date. However, operators who have already complied with the original issue of the Directive before this amendment may have already performed the inspections, but the ground check is new. For aeroplanes that have not previously accomplished the original requirements, they must do both the inspections and the ground check. The costs include labour, parts, potential replacement of torque transmitters or transducers, adjustment of transducer output voltage, and the cost of the ground run. There is no explicit cost estimate in the directive. Private operators and commercial operators face direct outlays; maintenance organisations may see increased business. The directive itself does not provide for any compensation or exemption.