AD/MU-2/63 - Landing Gear Drive Train
1AD/MU-2/63 - Landing Gear Drive Train
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/MU-2/63 - Landing Gear Drive Train.
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text
Mitsubishi MU-2 Series Aeroplanes
Image unavailable in extracted text11/98
Requirement: 1. Inspect the torque shaft (part number 030A-38605-21) for correct spline connection in accordance with paragraph 4 of Mitsubishi Heavy Industry MU-2 Service Bulletin (SB) 235, dated 4 August 1998.
- If the distance measured in the Requirement 1 inspection is less than 12mm, before further flight, replace or modify the torque shaft assembly in accordance with paragraph 5 of SB 235.
Note: JCAB AD TCD-4838-98 refers.
Compliance: Unless already accomplished, within 100 hours time in service after 8 October 1998.
This airworthiness directive becomes effective on 8 October 1998.
Background: This Directive is to prevent disconnection within the landing gear drive train, which could result in a situation with the nose gear extended and the main gear retracted.