The AD sets a clear sequence of technical actions tied to deadlines and a specific procedural source. Compliance should follow the AD’s staged obligations exactly as stated and using the MSB procedures referred to in the AD.
Step 1 , Verify applicability
- Confirm whether the aircraft is one of the named models: M20B, M20C, M20D, M20E, M20F, M20G, or M20J. Then confirm whether the aircraft is fitted with an O & N Bladder Fuel Cell installed under STC SA2277CE or STC SA2350CE. The AD applies only where both model and STC-fit criteria are met.
Step 2 , Acquire the MSB
- Obtain a copy of O & N Aircraft Modifications Inc. Mandatory Service Bulletin No. ON-100 dated 1 February 1998. The AD requires inspections and modifications to be performed “using procedure described in MSB ON-100,” so adherence to that MSB is the basis of compliance.
Step 3 , Drain-valve inspection (Requirement 1)
- Inspect the drain valve on both the left and right wing in accordance with MSB ON-100 to verify that the drain valve is fully inserted into the drain nipple. Conduct this inspection no later than 12 calendar months after the AD’s effective date unless it has already been accomplished. If the drain-valve inspection detects the valve is not fully inserted:
Step 4 , Immediate remedial action (Requirement 2)
- Modify any drain valve found not fully inserted using the MSB ON-100 procedure before further flight. The AD explicitly makes this an immediate pre-flight condition for affected valves. Ensure that this modification follows the MSB steps exactly.
Step 5 , Perform the defined wing modifications (Requirement 3)
- Using MSB ON-100, on both left and right wings perform:
a) installation of a foam wedge to reduce the amount of trapped fluids in the centre fuel cell;
b) installation of an anti-ice mast forward of the vent tubes to prevent vent icing;
c) drilling a vent hole to prevent icing of the engine’s crankcase breathers; and
d) replacement of flush style fuel caps and adapters with raised style caps and adapters.
- Complete these modifications within 12 calendar months after the effective date of the AD unless already done.
Step 6 , Consider alternative compliance for fuel caps
- For the fuel-cap replacement element (Requirement 3(d)), the AD identifies instructions in paragraph (f) of FAA AD 2004-25-04 Amendment 39-13891 as an alternative method of compliance. If choosing that alternative, obtain and follow the FAA paragraph (f) instructions cited in the AD and ensure acceptance of that method for the operator’s regulatory environment. Document the chosen method and the rationale for relying on the alternative as part of the maintenance records.
Step 7 , Parts, tools and personnel
- Source parts and tools required by MSB ON-100: foam wedge, anti-ice mast, raised style caps and adapters, and any fasteners or sealants specified. Confirm the MSB’s specified part numbers and acceptability criteria. Use suitably qualified maintenance personnel authorised to perform the tasks and, where appropriate, perform work under the aircraft’s approved maintenance programme.
Step 8 , Recordkeeping and certification
- Although the AD text does not specify a recordkeeping form, document the inspection and each modification in the aircraft’s maintenance records, including the MSB edition used, dates of work, serial numbers (as relevant), the person or organisation performing the work, and any parts fitted. Retain records as part of the aircraft’s maintenance documentation to evidence compliance with the AD’s requirements.
Step 9 , Operational decisions following findings
- If an inspection reveals a non-inserted drain valve, do not operate the aircraft until the required corrective modification has been made “before further flight” as the AD requires. For other items where compliance is within 12 months, plan maintenance to minimise downtime and ensure that all tasks are completed within the AD’s timeframe.
Step 10 , Liaison with regulator if unclear
- If there are uncertainties about the acceptability of alternative methods of compliance, parts substitutions, or interpretation of MSB ON-100 steps, consult the Civil Aviation Safety Authority or the issuing delegate for guidance. The AD cites an FAA paragraph as an alternative for one task; verify with CASA (or the applicable authority) whether reliance on the FAA paragraph requires any additional approvals.
Following these steps will align activity with the AD’s explicit requirements as contained in the source text: inspect drain valves per MSB ON-100; remediate non-inserted valves before further flight; and within 12 months complete all specified modifications using the MSB procedures, subject to the narrow FAA alternative for fuel caps.