What it does
This airworthiness directive (AD/LJ45/8) mandates three distinct actions on certain Learjet Model 45 aeroplanes, issued by the Delegate of the Civil Aviation Safety Authority on 15 December 2005 with an effective date of 20 December 2005. The directive responds to a Federal Aviation Administration (FAA) report of a fire in the left-hand engine nacelle caused by an alternator electrical wire bundle chafing a hole in a hydraulic line. The first requirement is to modify the electrical wire bundle for the alternator on the left‑hand engine and perform a general visual inspection of both left and right engines to confirm proper clearances between all wiring harnesses and engine tubing. This must be done within 50 hours time in service after the effective date, using the specific Bombardier Alert Service Bulletins listed: SB A40‑71‑01 (dated 29 September 2005) for serial numbers 45‑2001 through 45‑2029 inclusive, and SB A45‑71‑4 (dated 29 September 2005) for serial numbers 45‑005 through 45‑273 inclusive. The second requirement is to correct any improper clearances discovered during that inspection before further flight. The third requirement applies to narrower serial number ranges: for aeroplanes with serial numbers 45‑2001 through 45‑2015 inclusive and 45‑005 through 45‑254 inclusive, the operator must replace the fuses for the hydraulic shutoff valves with fuses having higher amperage, using Bombardier Service Bulletin SB 40‑24‑01 (dated 22 April 2005) or SB 45‑24‑6 (dated 22 April 2005), respectively. This fuse replacement must be completed concurrently with or prior to completing Requirement 1. The directive permits later revisions of these service bulletins, provided they are approved by the FAA as an Alternate Method of Compliance (AMOC) to FAA AD 2005‑24‑13. That FAA AD (Amdt 39‑14393) is referenced as underlying the Australian directive. The directive thus imposes a time‑limited, prescriptive compliance obligation on operators and maintenance organisations, with costs falling on private aircraft owners and operators. The compliance timeline is tight: 50 hours in service after 20 December 2005, with corrective actions required before further flight and fuse replacement linked to the same inspection deadline. The directive is a classic example of a mandated retrofit based on a single incident report, requiring both immediate labour and parts costs and ongoing record‑keeping.