AD/LEARJET 35/1 - Primary Control System Stop Bolts - Inspection and Replacement
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
View image in the official source Gates Learjet 35 and 36 Series Aeroplanes
AD/LEARJET 35/1 Primary Control System Stop Bolts - Inspection and Replacement
Applicability: All model 35 with S/Nos. 35-001 to 35-039.
All model 36 with S/Nos. 36-001 to 36-016.
Document: Gates Learjet SB 35/36-27-3.
Compliance: Within 300 hours time in service after 30 April 1976.
4/76