What it does
This instrument is an Airworthiness Directive (AD) addressing risk of front compressor front hub failure in certain Pratt & Whitney JT8D turbofan engines. It prescribes mandatory inspection and, where necessary, replacement actions targeted at cracks that may emanate from the base of the acute corner of the dovetail blade slots, and at loss of shotpeening effectiveness in the rim area of the hub. The AD identifies applicability, the inspection options, corrective action where cracks are found, and a staged inspection regimen with specific cycle-based intervals. It also accepts later revisions of the manufacturer’s Alert Service Bulletin (ASB) as an Alternate Method of Compliance (AMOC) where those revisions have United States Federal Aviation Administration (FAA) approval (see the note on later revisions). The AD becomes effective on 19 November 2009.
Mechanically, the AD requires operators of affected engines to: determine whether the engine/hub is within the applicability list supplied by the ASB; if so, and the hub has accumulated 6,000 cycles or more, perform one of three inspection procedures described in Requirement 1.a-1.c to detect cracks originating at the acute corner of the dovetail slots, and replace the hub if any crack is found (Requirement 1.d). For hubs listed in table III of the ASB, the AD additionally requires a visual check to confirm whether the hub rim has been shotpeened (Requirement 2.a), and, if not shotpeened, to subject that hub to the inspections and intervals of Requirement 1 (Requirement 2.b). The AD specifies the inspection intervals (e.g. within 150 cycles, every 150 cycles, every 400 cycles, or every 1,500 cycles depending on the method used), and the immediate replacement before further flight where a crack is found (Compliance section).
The AD locates the technical scope in ASB No. 2944 Revision No. 13 dated 22 October 2008, which lists engine and hub serial numbers affected. It also references FAA AD 71-07-01 (Amdt. 39-1279 dated 7 September 1971) as the earlier FAA instrument on the issue, and records that later ASB revisions approved by the FAA as AMOCs to FAA AD 71-07-01 are considered acceptable for compliance with the equivalent requirements of this AD. The instrument is signed by a CASA Delegate and dated 28 September 2009 (with effect from 19 November 2009), and it records a succinct background statement that surface defects in the hub may lead to failure and loss of control, and that the AD follows a review of earlier airworthiness directives that preceded changes to CASR 39.