Compliance requires a step‑by‑step process based on the AD and the referenced SB. Operators should follow these steps:
Step 1: Obtain the applicable documents. The AD requires Kawasaki Service Bulletin No. KSB‑117‑307A, Revision A (or a later JCAB‑approved revision). The operator must obtain a copy from Kawasaki or an authorised distributor. The cost of the SB may be nominal but non‑trivial. The operator should also obtain a copy of the AD itself (available from CASA’s website) and the JCAB AD TCD 7494‑1‑2009 for reference.
Step 2: Identify the serial number of the bevel gear installed in the IGB. Follow the SB’s instructions. This may involve removing access panels or partially disassembling the gearbox. If the gear’s serial number is already recorded in maintenance records from a previous installation, and the SB allows reliance on such records, the operator can use that information. The operator must ensure the serial number is accurately read and recorded.
Step 3: Compare the serial number against Table 1 of the SB. The table lists all serial numbers of bevel gears with sub‑specification tooth foot fillets. The operator must ensure they are looking at the correct revision of the SB; the AD mandates Rev A. If using a later JCAB‑approved revision, the operator must confirm the JCAB approval.
Step 4a: If the serial number is NOT in Table 1: No further action is required by the AD. However, to demonstrate compliance, the operator should make a logbook entry recording the date, the serial number found, the SB revision used, and the fact that the gear is not affected. This evidence is essential for future audits.
Step 4b: If the serial number IS in Table 1: The gear is affected. The operator must enter the reduced life limit into two places: (a) the list of life‑limited parts for the helicopter (often part of the airworthiness status record), and (b) the log card of the IGB (a separate record that travels with the component). The reduced life limit is specified in the SB; the operator must copy that limit exactly. If the IGB log card is missing or incomplete, the operator should create a new one or update the existing one.
Step 5: Determine whether the gear has already exceeded the reduced life limit. Compare the gear’s accumulated operating time (or cycles) since new or last overhaul with the reduced limit. If the accumulated value is greater than or equal to the reduced limit, the gear has exceeded it and must be replaced before further flight. Replacement must be in accordance with the SB’s instructions. If the gear has not yet exceeded the reduced limit, the operator can continue to operate it up to that limit, but must monitor its life and plan for future replacement.
Step 6: If replacement is required (Step 5): Obtain a serviceable replacement gear (P/N 4639 310 065) that is not affected (i.e., whose serial number is not in Table 1). Follow the SB’s installation procedures. After installation, update the list of life‑limited parts and the IGB log card to reflect the new gear’s serial number and original life limit (or an applicable AD‑mandated reduced limit if the new gear is also affected - though this is unlikely if the replacement is from a later production batch). Record the replacement in the aircraft’s maintenance log.
Step 7: For all steps, ensure proper documentation. The AD does not prescribe record‑keeping, but under CASR Part 42 the operator must maintain records of all AD compliance actions. Use a standard AD compliance log or include entries in the aircraft’s technical log. Retain the SB used and any calculations showing how the reduced life limit was applied.
Step 8: Ongoing monitoring. If the gear is affected but not yet exceeded, the operator must incorporate the reduced life limit into the aircraft’s maintenance program. This means that future maintenance checks must consider the new limit. The operator must also watch for any later JCAB‑approved revisions to the SB that might add serial numbers or change the reduced limit. If such a revision occurs, the operator must repeat the inspection and potentially adjust limits. The AD does not set a regular review period; the onus is on the operator to stay informed.
Step 9: Coordinate with maintenance provider. If the operator uses a Part 145 organisation, they must ensure the organisation has the required data and approval. The operator should provide a copy of the AD and SB to the organisation and verify that the work is performed correctly before signing off.
Step 10: Report any difficulties. If the SB is unobtainable, or if the serial number cannot be read without damaging the gear, the operator should contact CASA for guidance. While the AD does not provide an alternative means of compliance mechanism, CASA may grant a variation under CASR 39.007 if good cause is shown. Do not assume CASA will accept a non‑standard approach.