What it does
This Airworthiness Directive (AD/J4100/2) requires operators of BAe Systems (Operations) Jetstream 4100 Series aeroplanes to inspect, and where necessary remove, replace and modify, the Nose Landing Gear (NLG) capsule to address a risk that the nose gear may fail to fully extend. The instrument sets mandatory, aircraft‑level actions and specific compliance windows. Mechanically, it mandates an initial inspection of the NLG capsule in accordance with Paragraph 2B of Service Bulletin (SB) J41‑A32‑082 Revision 2 or a later approved revision; if that inspection shows unacceptable free movement, the AD requires removal of the NLG and installation of a serviceable unit followed by an inspection per Paragraph 2.B. of SB J41‑A32‑082 Rev 2; it requires repetition of those checks; and it requires embodiment of the modification described in Paragraph 2.B. of SB J41‑A32‑084 Revision 0 or later approved revision (identified in other documents as modification JM41670) which installs an NLG with modified bearings and lubrication provisions in the shortening mechanism (Requirement 1-4, Requirement text).
The AD prescribes repeat inspection intervals that differ depending on whether the aircraft has the JM41670 modification embodied: for aircraft without SB J41‑A32‑084 Rev 0 embodied, the repeat interval is not to exceed 800 flight hours; for aircraft with SB J41‑A32‑084 Rev 0 embodied, the repeat interval is not to exceed 3000 flight hours (Compliance, items 3). The AD also sets a specific timing requirement for modification or replacement activities, including a 30‑day window after the AD effective date where a replacement gear needs fitting, or a deadline of prior to 30 June 2012, whichever occurs first (Compliance, item 4).
The AD became effective on 20 February 2008 and is signed by a Delegate of the Civil Aviation Safety Authority (David Punshon) on 14 February 2008 (document footer). The stated safety rationale in the AD and its Background section attributes the action to multiple incidents of NLG failure to fully extend, including two incidents that precipitated SB J41‑A32‑082 Rev 1 and a later third incident in 2005 that led to the revision 2 inspection method and reduced repeat interval; the modification JM41670 was developed to change bearings and lubrication and to permit a revised, longer inspection interval (Background). The AD explicitly refers to EASA AD 2006‑0131 dated 18 May 2006 (Requirement note).