AD/HS 125/93 - Electrical Power - DC Bus Tie System
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
View image in the official source British Aerospace BAe 125 Series Aeroplanes
AD/HS 125/93 Electrical Power - DC Bus Tie System 8/88
Applicability: All BAe 125 aircraft post mod 251335. Requirement: Action in accordance with BAe 125 SB 24-264. Compliance: Prior to 6 October 1988.
Background: BAe have advised that a case has occurred where the PS1 and PS2 DC bus bars remained electrically connected with the bus-tie contactor opened.