Step 1 , Confirm applicability: Verify the aircraft model. The AD applies to "All models up to and including BAe 125-800B series" (Applicability). Confirm the aircraft’s model designation against maintenance records or the certificate of airworthiness to ensure the AD applies.
Step 2 , Obtain the referenced FAA AD: The CASA instrument requires actions "in accordance with FAA AD 89-18-07 R1, amendment 39-10878, effective 18 December 1998" (Requirement). Obtain that FAA AD document in full, and read its inspection methods, defect limits, and required corrective actions. The CASA AD does not reproduce those details.
Step 3 , Determine status of prior compliance: The Compliance text provides a conditional carve‑out: "Unless already accomplished." Check maintenance records to determine whether the FAA AD actions were previously completed. If so, ensure records clearly document the date, the work performed and the approving maintenance organisation or engineer.
Step 4 , Schedule inspection before the deadline: If the FAA AD action has not already been accomplished, schedule the required inspection and any necessary remedial work so it is finished before further flight after 21 June 2010 (Compliance). Given the effective date of this Amendment is 7 June 2010, the scheduling window may be short. Plan for potential aircraft downtime and availability of maintenance capacity.
Step 5 , Perform inspections and corrective actions per the FAA AD: Execute the FAA AD’s specified inspections, measurements and any required repairs or replacements, using appropriately certificated maintenance personnel and parts approved for the aircraft. If the FAA AD requires engineering approvals for certain repairs, obtain those approvals before re-entry into service.
Step 6 , Coordinate with the two-year maintenance schedule: The Background notes the aircraft series maintenance schedules contain ongoing structural inspection requirements every two years for these parts. Integrate the FAA AD work with the recurring two-year structural inspection programme to avoid duplication and to ensure continuing compliance.
Step 7 , Document completion: Although the AD does not specify documentary form, maintain clear records showing the FAA AD actions were performed, including date, work scope, parts used, approval signatures and any engineering documentation. These records will be necessary to demonstrate that the work was "already accomplished" if queried under this or subsequent directives.
Step 8 , Plan for parts and logistics: If inspection reveals corrosion requiring replacement of side plates, spigots or balance weights, arrange for procurement of approved parts and any necessary engineering evaluations. Because the AD does not specify parts, ensure any replacement items are compatible with the aircraft’s type certificate data and the FAA AD’s instructions.
Step 9 , Follow up with CASA or delegate if unsure: The AD was issued by a CASA delegate (signature block). If there is uncertainty about compliance status, documentary sufficiency, or the application of the FAA AD to particular aircraft variants, contact CASA or its delegate function for administrative clarification. The AD itself does not set out relief procedures, so early engagement reduces risk.
Step 10 , Incorporate into continuing airworthiness records: After completing the required action, update the aircraft logbooks and continuing airworthiness records to reflect compliance with AD/HS 125/89 Amdt 3 and the referenced FAA AD action, and to reflect any parts replacement or repairs carried out. Also ensure the biennial structural inspection programme records are aligned with these entries.
Who pays and resource implications: The AD imposes a maintenance obligation on aircraft owners/operators. Costs for inspection, labour, parts, possible grounding and logistics fall to them. Maintenance organisations will provide labour and materials; operators should budget for potential unscheduled repair costs and downtime. The AD does not provide funding or compensation mechanisms.
Record retention and audit readiness: Maintain accessible records showing compliance and any associated maintenance action, because the instrument’s operational effect is to require the work be done before flight; demonstrable evidence will be the practical means to show compliance if questioned.
Summary action checklist (practical): (1) Confirm applicability; (2) obtain FAA AD 89-18-07 R1; (3) review maintenance records for prior compliance; (4) if not done, schedule and complete inspection/repair before further flight after 21 June 2010; (5) document work and integrate it with the two-year structural inspection programme; (6) retain records and engage CASA if clarification is needed.