AD/HS 125/54 - Fuselage Front Pressure Bulkhead - Inspection
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
View image in the official source British Aerospace BAe 125 Series Aeroplanes
AD/HS 125/54 Fuselage Front Pressure Bulkhead - Inspection 10/80
Applicability: All HS/DH/BH 125 models up to and including Series 400. Document: British Aerospace 125 SB No. 53-52.
Compliance: As per requirement document except that stated flights shall be pressurised flights.
Background: Cracking in the corner bend radii of both control pressings on one aircraft was discovered on an overseas aeroplane after 6700 flights.