To comply with this AD as written, follow the sequence and methods the AD specifies, and observe the stated compliance windows. Step 1, confirm applicability: verify the aircraft serial number is one of those listed in the Applicability section , 258541, 258556 and 258567 through 258608 inclusive. Only those airframes are subject to the AD’s mandates.
Step 2, obtain the normative documents: secure Raytheon Service Bulletin SB 24-3555 Revision 1 dated June 2004, and the Temporary Change P/N 140-590032-0005TC7 referenced for the Aircraft Fight Manual insertion. The AD requires inspections, repairs and modifications "in accordance with" Parts 1 and 2 of SB 24-3555 Rev 1, so those Parts are the operative technical instructions.
Step 3, perform Requirement 1: carry out a "detailed inspection for damage (primarily but not limited to evidence of heat damage) of wiring in the flight compartment in accordance with Part 1 of the Accomplishment Instructions of Raytheon Service Bulletin (SB) 24-3555, Revision 1 dated June 2004." Do this within 50 hours TIS or 30 days, whichever occurs first, following the AD's effective date. Follow Note 1's definition of detailed inspection, including cleaning surfaces as necessary and using direct lighting and inspection aids like mirrors or magnifying lenses.
Step 4, if damage is found during Step 3, perform Requirement 2: repair the wiring "in accordance with Part 1 of the Accomplishment Instructions of SB 24-3555 Rev 1" and complete that repair before further flight after the inspection.
Step 5, perform Requirement 3: modify the emergency radio circuit "as detailed in the Part 2 of the Accomplishment Instructions of SB 24-3555 Rev 1." If damage was found during Step 3, complete the modification before further flight after the inspection. If no damage was found, complete the modification within 300 hours TIS or 180 calendar days after the AD’s effective date. Schedule parts and maintenance resources accordingly.
Step 6, perform Requirement 4: after completing the modification in Step 5, conduct the functionality check of the emergency radio system before further flight.
Step 7, perform Requirement 5: revise the Aircraft Fight Manual Emergency Procedure section by inserting Temporary Change P/N 140-590032-0005TC7, to be done before further flight after the modification.
Additional practical compliance steps not explicitly stated but implied by the AD’s actions are to plan for labour and tooling consistent with a "detailed inspection," ensure maintenance staff are familiar with and have access to SB 24-3555 Rev 1, and obtain any parts specified in Part 2 of the SB for the emergency radio circuit modification. Keep maintenance records of the inspection, repairs, modification, functionality check and manual insertion, noting dates, personnel, and referenced SB Part numbers, since the AD imposes clear "before further flight" and dated deadlines; while the AD itself does not specify the form of records, typical airworthiness practice requires documentation of completed work.
If damage is found, treat the aircraft as unserviceable for further flight until repairs and the modification plus the functionality check and AFM update are completed, consistent with the AD’s "before further flight" language. Confirm that the Temporary Change P/N is correctly inserted into the flight manual emergency procedure section and retain evidence of that insertion.
Where uncertainty exists about the adequacy of a proposed repair method or parts, consult the Raytheon SB Part 1 and Part 2 text for technical detail. The AD does not provide an alternative method of compliance in its text; for any deviation from the SB, contact the Civil Aviation Safety Authority for guidance because the AD requires actions "in accordance with" the SB and does not itself authorise substitutes.
Finally, note the AD’s effective date of 1 June 2005 and ensure the compliance windows are calculated from that date as the AD prescribes. The AD’s signatory is noted as James Coyne, Delegate of the Civil Aviation Safety Authority, and the AD references FAA AD 2005-09-03 Amdt 39-14071 as related material; keep that cross-reference in mind if operating the aircraft internationally, but rely on SB 24-3555 Rev 1 and the AD’s Requirements and Compliance sections to meet the Australian AD obligations.