AD/HS 125/114 - Generator Control Unit (GCU) Earth Wire
1AD/HS 125/114 - Generator Control Unit (GCU) Earth Wire
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/HS 125/114 - Generator Control Unit (GCU) Earth Wire.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text British Aerospace BAe 125 Series Aeroplanes
AD/HS 125/114 Generator Control Unit (GCU) Earth Wire 2/91
DM
Applicability: All BAe 125 aircraft as listed in the Requirement document. Requirement: Action in accordance with BAe SB 24-A278.
Note: Compliance with this SB has been classified Mandatory by the UK CAA.
Compliance: Prior to 31 January 1991.
Background: Loss of GCU earth connection can result in a DC generator overvoltage which can cause battery overheat and subsequent failure.