Step 1, confirm applicability: Verify each BK 117C-2 in fleet to determine whether it is fitted with Tail Rotor Control Lever P/N B642M1009103. The AD’s Applicability clause confines obligations to aircraft with that specific P/N (Applicability). Do not assume applicability based on model alone.
Step 2, obtain and follow the ASB: Acquire EUROCOPTER DEUTSCHLAND Alert Service Bulletin MBB BK117 C-2-64A-002 Revision 02 dated 6 August 2007, and any subsequent EASA-approved revisions. The AD requires inspections and replacement to be performed "in accordance with section 3.A" and "section 3.B" of that ASB (Requirement 1 and 4). Use only the ASB provisions that are current and EASA-approved as the method of accomplishment.
Step 3, schedule and execute the initial inspection according to prior compliance status: If the helicopter has not been inspected under the original issue of the AD, perform the visual inspection before further flight after the amendment’s effective date (Compliance). If the helicopter was inspected under the original AD, perform the next inspection within 8 flight hours or before accumulating 25 flight hours after the last inspection, whichever occurs first (Compliance). Ensure the mechanic or certifying staff records the inspection in the aircraft’s maintenance log.
Step 4, perform repetitive inspections until terminating action: After the initial inspection, repeat the inspection at intervals not to exceed 8 flight hours until the full replacement is completed on that helicopter (Requirement 2; Compliance). Set up flight-hour tracking and inspection scheduling to ensure no interval exceeds 8 flight hours.
Step 5, replace damaged parts immediately: If any inspection identifies "score marks, notching, scratching, cracks or similar damage", remove the affected control lever and replace it with an airworthy part before further flight in accordance with the ASB (Requirement 3). Document the defect and the replacement action in the maintenance records.
Step 6, accomplish fleet replacement to obtain terminating action: Replace all P/N B642M1009103 Tail Rotor Control Levers and weights P/N B642M1011202 with the improved P/N B642M1009104 Tail Rotor Control Levers including weights in accordance with section 3.B of the ASB (Requirement 4). After installing the improved assembly on any helicopter, the repetitive 8 flight-hour inspections are no longer required for that helicopter. Ensure the replacement is documented and show how the ASB procedures were followed.
Step 7, enforce the installation prohibition: From 25 November 2007, do not install P/N B642M1009103 on any helicopter (Requirement 5; Compliance). Implement inventory controls to segregate and if necessary destroy or render unusable any legacy P/N B642M1009103 spares that remain in stock to prevent inadvertent installation. Update parts lists and maintenance policies to reflect the prohibition.
Step 8, maintain clear records: Log each inspection with date, flight hours at inspection, findings, corrective action taken, parts installed including P/Ns, and reference to the ASB section used. Because the AD uses "before further flight" and short inspection intervals, accurate maintenance log entries are essential to demonstrate compliance.
Step 9, coordinate procurement and maintenance planning: Given the short inspection intervals and the fleet replacement requirement, plan procurement of P/N B642M1009104 assemblies in advance to meet the AD’s terminating action. Coordinate with approved maintenance organisations to ensure replacement work is executed in accordance with section 3.B of the ASB.
Step 10, follow updated EASA-approved ASB revisions if they become available: The AD permits using subsequent EASA-approved revisions of the ASB for inspection and replacement (Requirement 1). If a new EASA-approved revision of the ASB is published, confirm whether it changes inspection techniques, acceptance criteria, or replacement steps, and update maintenance procedures accordingly.
Step 11, confirm regulatory status and sign-off: Ensure that the maintenance release or certificate of release to service references the AD and the ASB sections used for compliance. The AD is an Airworthiness Directive issued by CASA and signed by the delegate; demonstrate regulatory compliance in the aircraft’s records and through any required notifications to the authority, consistent with national maintenance and airworthiness practices (signature block; Compliance).
The AD text prescribes the required actions and references the ASB methods. Follow the precise P/N and ASB references in the AD to ensure compliance, and do not substitute alternative methods unless an EASA-approved revision or regulator-authorised alternate means of compliance is documented.