AD/G21/1 - Below Floor Control System Components - Inspection
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
View image in the official source Grumman G21 (Goose) Series Aeroplanes
AD/G21/1 Below Floor Control System Components - Inspection
10/77
Applicability: All models.
Requirement: 1. Remove and disassemble:
(i) Elevator Torque Tube Assembly P/N 12755,
(ii) Rudder Torque Tube Assembly P/N 12756,
(iii) Rudder Pedal Torque Tube Assembly LH and RH P/N 12757 and 12758,
(iv) Hinge Support Assembly P/N 12725.
- Inspect all parts for corrosion and/or cracks using visual and dye penetrant or magnetic particle techniques.
Note: FAA AD 73-12-6 Amendment 39-1657 refers.
Compliance: Initially before issue of Certificate of Airworthiness and there- after at intervals not exceeding 2000 hours time in service or two years whichever occurs first.