What it does
This airworthiness directive (AD/F50/96 Amdt 1) mandates mandatory inspections and, where cracks are found, repairs of the fuselage bottom skin chine line on Fokker F27 Mark 050 aircraft (serial numbers 20103 through 20172). It requires two distinct visual inspection zones: between fuselage stations (STA) 6675 and 15375, and between STA 1320 and 3100, following the instructions in Fokker Services Service Bulletin SBF50-53-058 (dated 30 June 2006 or later EASA approved revision). The visual inspection must look for cracks appearing through the paint layer. If any are found, the directive prescribes escalating actions depending on crack length, including paint removal per AMM Chapter 51-24-00, further visual reinspection, eddy-current inspection per SBF50-53-059 (dated 24 August 2006 or later EASA approved revision), and if the crack exceeds 100 mm, repair before further flight using SRM Chapter 53-00-02 Repair No. 10. A third requirement mandates an eddy-current inspection of the same chine line areas within 1,000 flight cycles after the visual inspection regardless of whether cracks were found. Any cracks discovered during that eddy-current inspection also trigger the same length based repair thresholds. Finally, any findings must be reported to Fokker Services B.V. within 7 days after the inspection.
The compliance triggers for the two visual inspections are based on accumulating total flight cycles: 20,000 total flight cycles or within 3 weeks after 31 August 2006 (whichever occurs later) for the first zone, and 45,000 total flight cycles or within 3 weeks after 31 August 2006 for the second zone. The eddy-current inspection must be done within 1,000 flight cycles after the visual inspection is accomplished. The compliance times for the first two requirements are stated to remain unchanged from the earlier version of this AD. The amendment becomes effective on 23 November 2006. The background explains that the previous inspection procedure in the Fokker 50 Non-Destructive Testing Manual did not show the correct inspection areas, particularly the actual chine line at the kink in the bottom fuselage skin, and that many aircraft had already passed relevant thresholds by a considerable margin, creating risk of undetected cracks that could lead to fuselage bottom skin failure.