AD/F50/72 - Main Landing Gear Lock Link
1AD/F50/72 - Main Landing Gear Lock Link
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/F50/72 - Main Landing Gear Lock Link.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Fokker F50 (F27 Mk 50) Series Aeroplanes
AD/F50/72 Main Landing Gear Lock Link 3/97 DM
Applicability: All serial numbers.
Requirement: Unless already accomplished, action in accordance with Fokker SB F50-32-033.
Note: Netherlands BLA nr: 1996-146(A) refers.
Compliance: Within 7 days after 22 January 1997.
This Airworthiness Directive becomes effective on 22 January 1997.
Background: A MLG collapsed on roll out after landing. Investigation revealed that one of the two bolts that secure the downlock platform of the MLG locklink was missing. As a result of an AOT another operator reported broken lockwire and one of the affected bolts was loose. This unsafe condition if not corrected may result in further landing incidents.