Step 1 , Identify affected aeroplanes: Confirm whether each airframe is a Falcon 2000EX with serial number between 28 and 55 inclusive and whether SB F2000EX‑61 (22 March 2006) or SB F2000EX‑61 Revision 1 (22 March 2007) has already been implemented. This requires a review of the aircraft’s serial‑number plate and maintenance records to verify historic SB compliance (Applicability).
Step 2 , If not already done, obtain the SB and EASA approvals: Obtain Dassault Aviation Service Bulletin F2000EX‑61 (22 March 2006) or SB F2000EX‑61 Revision 1 (22 March 2007) as applicable. If a later SB revision is to be followed, confirm that the revision is approved by EASA before proceeding, because the AD requires compliance with the SB “or later revision approved by the European Aviation Safety Agency (EASA)” (Requirement; Note).
Step 3 , Schedule the work within the AD window: The AD became effective 10 May 2007 and requires completion by 30 June 2008 (Compliance). Plan maintenance availability, parts procurement, and downtime accordingly to ensure the replacement is completed prior to the deadline.
Step 4 , Use authorised maintenance organisations and follow the SB: Execute the replacement of passenger oxygen mask boxes strictly “in accordance with SB F2000EX‑61” or the approved later revision (Requirement). The SB will contain parts lists, removal and installation procedures, inspection steps, and acceptance criteria. Ensure personnel performing the work are qualified to carry out the SB tasks and that any required associated tasks or tests specified by the SB are completed.
Step 5 , Parts and technical coordination with Dassault: Coordinate procurement of the new‑design passenger oxygen mask boxes and any SB‑specified hardware or software changes with Dassault Aviation or authorised parts suppliers. The AD names Dassault as the SB originator, so Dassault will supply the SB‑specified parts and technical information (Applicability; Requirement).
Step 6 , Documentation and record entry: After completing the SB tasks, enter the completion details in the aircraft maintenance records and logbooks in the manner required by national maintenance regulations so there is demonstrable evidence that the AD requirement has been satisfied prior to 30 June 2008 (Requirement; Compliance). Record the SB number, revision, parts used, certifying mechanic or organisation, date of completion, and any test results required by the SB.
Step 7 , Verify compliance to the regulator: While the AD does not specify a formal notification process in its text, be prepared to present the maintenance records showing SB compliance to CASA or other relevant inspectors if requested. Operators whose aircraft operate internationally should confirm whether EASA or another authority requires separate notification.
Step 8 , If a later SB revision is used, secure EASA approval evidence: If relying upon a later revision to SB F2000EX‑61, retain explicit documentation of EASA’s approval of that revision, because the AD limits acceptable alternative SBs to those that are EASA‑approved (Requirement).
Step 9 , Operational prudence pending replacement: The AD does not set interim operational measures. If replacement cannot be completed immediately, operators should consider their own risk assessments and any separate manufacturer or regulator advisories to determine whether operational restrictions, additional crew procedures, or passenger limits are necessary until the mandated replacement is carried out (Background). Any interim measures should be documented and justifiable under the operator’s safety management system.
Step 10 , Liaise with legal and insurance advisers if there are disputes: Because the AD imposes a mandatory technical duty without addressing cost allocation, operators with questions about liability for parts, time, or workmanship should consult contractual documentation (leases, purchase agreements, maintenance contracts) and, where necessary, legal counsel or insurers to clarify responsibilities.
In sum, compliance is: (1) establish airframe applicability and prior SB compliance, (2) procure and implement the SB (or an EASA‑approved later revision), (3) complete and document the work by 30 June 2008, and (4) retain the documentation that demonstrates compliance for regulatory inspection (Applicability; Requirement; Compliance).