What it does
This airworthiness directive (AD) requires identification, repeated inspection and ultimate removal from service of specific main landing gear (MLG) axle pistons installed on Fokker Services F100 (F28 Mark 0100) aeroplanes where those pistons were overhauled by Aerospace NDI (ANDI) Pty Ltd using specified plating processes and process serial numbers. The AD is limited in scope to Goodrich MLG part numbers listed in the Applicability block, namely part numbers 41050 series (41050 -7 through -16) and 41060 series (-3 through -6) fitted with pistons part number 41141-7 that were treated using either the AeroNikl or Atotech plating processes and the enumerated process serial numbers. The Applicability also captures any MLG overhauled at ANDI while ANDI held CASA Certificate 1-RT6UE between 25 October 2019 and 18 November 2021 where either the AeroNikl or Atotech plating processes were used.
Mechanically the AD imposes two distinct duties. First, until affected pistons are removed, operators must carry out a detailed visual inspection (DVI) of the pistons prior to each flight, in accordance with Fokker Services All Operators Message (AOM) AOF100.230#5, “as in force at the date of this AD” (Requirement). The AD notes that pistons are marked with a serial number engraving near the torque link connection point, which is the means of physical identification. Second, the AD mandates permanent removal from service, and rendering unsalvageable, of all affected pistons (Requirement, b). Timing differs by plating process: pistons overhauled using the AeroNikl process must be removed by the AD’s effective date, and those overhauled using the Atotech process must be removed before 1 February 2024 (Compliance). The AD commences on 24 November 2022, which the text describes as the effective date (This AD commences on 24 November 2022 (the effective date)).
The AD is presented as an instrument to support Fokker Services AOM requirements and to implement an EASA notification concerning non‑compliance with SAE/AMS2424 plating process requirements. The Background identifies the technical hazard as internal hydrogen embrittlement leading to cracking and potential MLG axle piston failure with resultant dual wheel separation. The AD explicitly requires removal to prevent affected units entering the worldwide supply chain, in line with the EASA request to CASA.