Identify applicability and records: First, determine whether each aircraft is within the AD’s Applicability: "F28 Mark 0100 aircraft, all serial numbers, unless modified in service in accordance with SBF100‑24‑037 dated 2 October 2003 or later revision approved by the EASA." Confirm with maintenance records whether SBF100‑24‑037 was previously applied. If so, document the service bulletin revision and any EASA approvals relied upon to support the exclusion.
Select method of compliance for Requirement 1 within the 36‑month window: The AD sets two pathways for Requirement 1. The primary pathway is to: (a) "Remove the standard nuts and lock washers from electrical power contactors part number ... SG02206"; (b) "install new self‑locking nuts"; and (c) "perform the applicable tests on the AC Bus Transfer System in accordance with the Accomplishment Instructions of Fokker Services SBF100‑24‑041 dated 29 January 2008 or later revision approved by the EASA" (Requirement 1). Follow the Accomplishment Instructions precisely, using the version of SBF100‑24‑041 that is either the dated bulletin or a later EASA‑approved revision. Record the work, with dates, part numbers, and signatory details for authorised personnel.
Alternate pathway for Requirement 1: Alternatively, replace contactors P/N SG02206 with "improved versions in accordance with SBF100‑24‑037 or later revision approved by the EASA" as an alternate method of compliance, but only if the replacement is "accomplished within 36 months after the effective date of this Directive" (Note 1). If choosing this route, ensure SBF100‑24‑037’s EASA approval status and use the instructions in the approved revision. Record the replacement details, including serial numbers of replacement parts and conformity to the service bulletin.
Comply with parts-installation restriction after 31 May 2011: For forward maintenance planning, do not install SG02206 as a replacement on any aircraft "unless it has been modified in accordance with Goodrich Power Systems SB SG02206‑24‑01 dated 4 March 2008 or later revision approved by the EASA" (Requirement 2). That means before installing any SG02206 part after 31 May 2011, obtain evidence that the part has been modified per the Goodrich SB and that the revision used is EASA‑approved where required. Update parts records and procurement procedures to reject unmodified P/N SG02206 stock for F28 Mark 0100 installation after that date.
Confirm service bulletin revision approvals: For any SBF100‑24‑041, SBF100‑24‑037 or Goodrich SB SG02206‑24‑01 revision intended to be used, confirm EASA approval status. The AD explicitly conditions acceptability on EASA approval of later revisions. Keep a copy of the revision and the approval reference to attach to maintenance records.
Perform AC Bus Transfer System tests and retention of results: The AD requires "the applicable tests on the AC Bus Transfer System." Ensure the testing procedures and pass/fail criteria match those in the Accomplishment Instructions of SBF100‑24‑041. Capture test data and sign-offs in the aircraft maintenance records. If tests indicate anomalies, follow the fault-resolution steps in the service bulletin and do not return the aircraft to service until the specified corrective actions are completed and documented.
Manage parts inventory and procurement: Immediately review spare parts inventory for SG02206 contactors. For parts due to be installed after 31 May 2011, verify modification per Goodrich SB or plan for replacement with improved versions per SBF100‑24‑037. Establish parts‑traceability tags or electronic records identifying modification status, modification dates, and the Goodrich SB revision applied.
Coordinate with suppliers and maintenance providers: Ensure Goodrich, Fokker Service Bulletin holders or parts suppliers can provide certified evidence of modifications or manufacture to the improved specification. For outsourced maintenance, include the AD compliance steps and documentation requirements in contracts or work orders.
Plan scheduling and resource allocation: Because Requirement 1 has a 36‑month window from the effective date (effective date 31 July 2008), schedule the retrofit or replacement work into maintenance plans so that the work completes within that timeframe. Implement compliance tracking mechanisms (e.g., compliance registers) to avoid missing the deadline.
Document compliance evidence: Even though the AD text does not prescribe exact recordkeeping formats, expected documentary evidence includes maintenance release entries, parts installation records (part numbers and serial numbers), signed statements that the Accomplishment Instructions were followed, and test results for the AC Bus Transfer System. Retain copies of the specific, EASA‑approved service bulletin revisions used and any supplier modification certificates for Goodrich SB modifications.
Consider fleet-level and operational impacts: If multiple aircraft require the modification or replacement, consider bulk procurement of improved contactors per SBF100‑24‑037 or batching maintenance events to minimise aircraft downtime. Ensure that planned maintenance supports the required testing and that ground maintenance slots provide sufficient time.
Verify compliance for excluded aircraft: For any aircraft claimed to be excluded because they were previously modified per SBF100‑24‑037, assemble and retain documentation proving the date and revision used, and verify that the revision relied upon was EASA‑approved if the exclusion language requires it.
Prepare for audits or regulatory queries: Given the AD’s mandatory nature and its reliance on EASA approvals, be prepared to produce traceable records of the work performed, the service bulletin versions and approvals used, and the proof that any SG02206 installed after 31 May 2011 was modified per the Goodrich SB.
Escalation path for ambiguity: If any ambiguity arises in the Accomplishment Instructions or the EASA approval status of a service bulletin revision, consult the issuing authority or the service bulletin originator (Fokker or Goodrich) for clarification and retain written confirmation of any technical direction relied upon.
By following the specified physical modifications, tests and the parts‑control prohibitions and by retaining the EASA‑approval evidence for any later-revision service bulletins, operators and maintainers will have implemented the requirements stated in AD/F100/90.