What it does
AD/ERJ‑190/13 Amdt 1 is a mandatory airworthiness directive issued by the Civil Aviation Safety Authority (CASA) under the Civil Aviation Act 1988. It amends the original AD/ERJ‑190/13 and imposes a series of prescriptive actions on operators of Embraer ERJ‑190 series aeroplanes (models ERJ 190‑100 LR, ERJ 190‑100 STD, ERJ 190‑100 IGW, ERJ 190‑200 LR, ERJ 190‑200 STD, and ERJ 190‑200 IGW) concerning the fore and aft cargo doors. The directive responds to two documented events in which aircraft were dispatched and flown with a cargo door open - a condition that could lead to in‑flight pressurisation loss, structural damage, or cargo‑door separation. Mechanically, the AD requires five discrete actions: (1) removal and discard of a cover plate from the door surround trim lining, followed by a detailed inspection (DET) for interference of the door lock handle with the aft edge liner assembly, and rework of that liner; (2) removal of the aft surround trim lining to perform a DET for damage of the lateral roller fitting on the forward and aft cargo door frames, with replacement of damaged fittings with identical part‑number units; (3) repetition of the Requirement 2 inspection at intervals not exceeding 150 flight cycles; (4) relocation of the cargo door closed indication sensor per Embraer Service Bulletin SB 190‑52‑0023 and modification of the cargo door lock handle mechanism, plus replacement of two specific roller fittings with new parts per SB 190‑52‑0027; and (5) revision of the Airplane Maintenance Program to incorporate operational (OPC) and functional (FNC) checks of the cargo doors at repetitive intervals not exceeding 6000 flight hours, referencing AMM tasks dated 15 July 2008. The AD also defines two terminating actions: completing Requirement 4 stops the repetitive Requirement 3 inspections, and completing Requirement 5 acts as overall terminating action for the entire directive. Compliance times are mixed: initial inspections were due within 30 days after 3 July 2008 (the original effective date); the modification under Requirement 4 must be done within 5000 flight cycles after 21 October 2008; and the maintenance‑program revision under Requirement 5 must be complete within 365 days after 21 October 2008 or within 365 days after Requirement 4 is accomplished, whichever is later. The amendment itself became effective on 12 February 2009. The AD is a classic example of a backward‑looking, prescriptive regulatory intervention designed to close a known failure mode by imposing specific hardware changes and increased inspection frequencies, with attendant costs on operators that include direct labour, parts, aircraft downtime, and ongoing compliance monitoring.