Compliance hinges on three sequential steps: (1) determine applicability for each turbine engine and aircraft, (2) select an approved compliance pathway appropriate to the engine family and operations, and (3) implement the specific technical, administrative and reporting measures mandated.
Step 1 , Determine applicability and classification:
- Check whether the turbine engines are installed in aircraft excluded by the AD: aviation administered by an approved sports aviation body; limited category certificate aircraft under CASR 21.189; experimental certificate aircraft under CASR 21.195A (Applicability). If excluded, document the basis for exclusion in maintenance records.
- For engines within scope, identify engine family and model (Honeywell TPE331 series, PWC PT6A series or other turbine engines). Ascertain operational role for PT6A engines (whether conducting aerial agricultural operations or fire‑fighting operations) because Appendices differ by role (Requirements 1.3-1.4).
Step 2 , Choose the compliance route:
- Option A: Manufacturer TBO/CAM , For many operators the simplest route is to adopt the engine manufacturer’s published TBO hours or CAM program. The AD explicitly allows manufacturers’ recommended hours in service as one compliance path (Requirement 1.1), and for TPE331 specifically allows Honeywell Service Bulletin TBO or Honeywell CAM program (Requirement 1.2).
- Option B: AD intervals/Appendices , For PT6A engines, elect the AD’s specified engineering routes: (i) non‑agric PT6A: PWC Service Bulletin or overhaul ≤5,000 hours subject to Appendix A; (ii) agric/fire‑fighting PT6A: follow the PWC Service Bulletin or adopt an on‑condition program having regard to Appendix B (Requirements 1.3-1.4).
- Option C: Approved system of maintenance under regulation 42M , If you already hold a CASA approved system of maintenance, confirm that your system aligns with the AD requirements. If not previously approved, consider seeking approval under reg 42M and document equivalence to AD intervals and monitoring.
Step 3 , Implement technical measures (Appendices A and B when relevant):
- ECTM: If electing Appendix A or B, subscribe to WebECTM® or CAMP as required under PWC SIL GEN‑055 R10 and implement ECTM data collection, analysis, trend monitoring, and defined follow‑up actions. Ensure personnel conducting ECTM have documented qualification and training per Appendix requirements.
- Hot section inspections: Implement hot section inspections at the specified maximum intervals:
- Appendix A: not to exceed 1250 hours; or 1760 hours subject to boroscope inspections at intervals not exceeding 610 hours.
- Appendix B: not to exceed 1510 hours.
Schedule boroscope inspections where the extended interval option is elected.
- Fuel nozzle and engine accessory servicing: Clean and flow check fuel nozzles every 460 hours; maintain accessory TBOs in line with PWC recommendations.
- Oil filter and chip detector: Inspect the engine oil filter element every 220 hours for contamination and the reduction gearbox chip detector every 220 hours for contamination or continuity.
- Compressor actions: Inspect the 1st stage compressor for FOD, corrosion and contamination every 220 hours; perform compressor power recovery washes in response to trend deviations or at intervals not to exceed 220 hours or 3 calendar months (Appendix A item 9).
- Low utilisation oil change: For engines with annual utilisation <500 hours per annum, change engine oil at intervals not exceeding 12 calendar months.
- Life‑limited components and critical components: Replace life‑limited components in line with AD/ENG/7 and inspect critical components as per the applicable PWC Service Bulletin.
- Engine shop work‑scope: For Appendix B agricultural on‑condition program, ensure shop visit work‑scopes take account of PWC recommendations and minimum modification standards for engine durability (Appendix B item 10).
Step 4 , Administrative actions and recordkeeping:
- Pro‑rata TBO: For PT6A engines with hours in service greater than 75% of PWC published TBO at time of introduction into the program, apply a pro‑rata TBO according to Appendix A item 1.
- Programme review schedule: Perform a documented review of the maintenance program at intervals not exceeding two years, taking into account all major defects and defects affecting engine durability. Record outcomes of the review and submit to CASA using the DRS Portal or via Form 404 referencing AD/ENG/5 (Appendices A and B).
- Maintain evidence of compliance: Keep copies of the relevant manufacturer Service Bulletins, the Pratt & Whitney SIL GEN‑055 R10 (where claimed), ECTM vendor subscriptions, training records for personnel, inspection logs, component replacement records (including references to AD/ENG/7 life‑limited components), and DRS/Form 404 submissions.
Step 5 , Transition and continuity:
- If you have an existing AMOC or exclusion under AD/ENG/5 Amendment 9, map its terms to the Amendment 10 requirements and document equivalence. The AD indicates such AMOCs/exclusions are acceptable for compliance with equivalent requirements.
- Timelines: The AD is effective 31 March 2026; compliance is required no later than 30 June 2026. Schedule required changes (ECTM subscription, training, inspection slots, parts procurement) so that the chosen compliance route is fully operational by the compliance date.
Step 6 , Cross‑reference other ADs and documents:
- Confirm life‑limited components per AD/ENG/7 and ensure AD/ENG/7 compliance is integrated into the maintenance program.
- For Honeywell TPE331 engines rely on the latest Honeywell Service Bulletins or CAM program that apply to the model. Document which revision was used for compliance purposes.
Step 7 , Practical vendor and capacity planning:
- If electing Appendix A/B ECTM requirements, contact WebECTM® or CAMP to confirm onboarding timelines, data collection interfaces and training packages. Budget for subscription costs and data management.
- Plan for maintenance shop availability for hot section inspections, boroscope inspections, nozzle servicing and potential early overhauls in cases subject to pro‑rata TBO.
- Ensure supply chain availability for life‑limited parts and critical components that will be replaced on published life limits.
Step 8 , Legal and compliance checks:
- Seek legal/regulatory advice if there is uncertainty about whether an engine variant or specific operation falls within the AD’s applicability, or if you need to apply for or update an approved system of maintenance under regulation 42M.
- Document the choice of compliance path, technical documents relied upon (service bulletins, SIL GEN‑055 R10 where relevant), and the administrative proof of compliance (DRS/Form 404 receipts, training records).
By following these steps and aligning technical programmes and administrative processes to the specific intervals and reporting obligations set out in the AD and its Appendices, operators and maintenance organisations can create an auditable compliance trail that conforms to the AD’s requirements by the stated compliance date.