The AD uses a small set of concrete regulatory concepts and mechanisms. These are: applicability by model and part number; serial-number stratification; mandatory replacement with a specified new part number; incorporation by reference of manufacturer service bulletins; conditioned acceptance of later SB revisions only when approved by a foreign regulator (ANAC); staged compliance deadlines; an absolute prohibition on future installation; and an incident-based safety justification.
Applicability: The AD applies to "EMB-135 and EMB-145 series aeroplanes equipped with Landing Gear Electronic Unit (LGEU) part number (P/N) 355-022-002." The operational trigger is the presence of that specific P/N on an applicable model. The AD therefore defines the universe of affected aircraft by aircraft type combined with installed component P/N.
Serial-number stratification: The AD treats S/Ns differently. Requirement 1 targets units with S/Ns "from 1000 to 1999" and requires replacement within 12 months. Requirement 2 covers any remaining S/Ns of the same P/N and requires replacement within 30 months. This stratification imposes a stricter deadline on a named serial-number cohort, and a longer window for other serial numbers, while ultimately requiring replacement of all P/N 355-022-002 units.
Mandatory P/N swap and prohibition on reinstallation: All affected units must be replaced by LGEU P/N 355-022-003. Additionally, the AD imposes "may not be installed on any aeroplane as either a replacement spare or new installation" for P/N 355-022-002 after the stated date (after 12 September 2011). Consequently, operators must not only replace in-service units within the timeframes but must also prevent subsequent reinstallation or use of that part as a spare beyond the ban date.
Incorporation by reference and approval conditioning: The technical work must be performed "according to the detailed instructions and procedures described in the Embraer Service Bulletins (SB) 145-32-0120 original issue or 145LEG-32-0032 original issue, as applicable, or later revisions approved by the Brazilian Agência Nacional de Aviação Civil (ANAC)." The AD therefore imports the manufacturer's procedural detail by reference and conditions acceptance of later revisions on ANAC approval. The AD also cross-references "ANAC AD 2009-01-01 and Errata."
Compliance timing and effective date: The AD sets two compliance windows (12 months and 30 months) measured from the AD's effective date, which the AD records as 12 March 2009. The staged deadlines create scheduling constraints for operators and maintenance organisations.
Safety justification and incident description: The AD’s background records a single incident in which landing gear indications were inconsistent,three green lights then an "LG/LEVER DISAGREE EICAS" message,leading to a go-around and momentary settling onto the flaps and belly. The AD states this "may occur in other aeroplanes of the same type and affects flight safety," which is the regulatory rationale for mandatory corrective action.
Authority and signature: The AD is issued under the authority of the Civil Aviation Safety Authority, with the document signed by "James Coyne, Delegate of the Civil Aviation Safety Authority" dated 27 January 2009. The AD also identifies itself with code "AD/EMB-145/22."
Interaction with foreign regulator and manufacturer: The text ties Australian compliance to service bulletins from Embraer and to approvals by Brazil’s ANAC. Those links mean that Australian operators must follow Embraer SB procedures and ensure that any later SB revisions they rely on carry ANAC approval as required by the AD.
Document identifiers: The AD is named in multiple repeated lines as "AD/EMB-145/22," includes the subject "Landing Gear Electronic Unit," and records issue identifier "3/2009." It also contains the two Embraer SB references: "145-32-0120" and "145LEG-32-0032."
These are the building blocks that make the AD operationally executable: identify aircraft with P/N 355-022-002, check serial numbers, schedule replacement per the relevant SB and approved revisions, and ensure no reinstallation of the banned P/N after 12 September 2011.