Embraer EMB-135 and EMB-145 Series Aeroplanes
Embraer EMB-135 and EMB-145 Series Aeroplanes
| AD/EMB-145/17 | Fuel System Reassessment | 9/2008 |
|---|
| Applicability: | Embraer EMB-145, EMB-145ER, EMB-145EU, EMB-145EP, EMB-145LR,EMB-145LU, EMB-145MR, EMB-145MP, EMB-145MK and EMB-145XR aircraft models in operation.This AD is not applicable to EMB-145LR aircraft modified according to Brazilian Supplemental Type Certificate (CHST) Nos. 2002S06-09, 2002S06-10 or2003S08-01. |
|---|---|
| Requirement: | 1. Alter the aircraft approved maintenance plan to include the tasks and their implementation plan presented in the Appendix 2, Section A2.5.2: Fuel System Limitation Items, as shown in the MRB-145/1150 Revision 10, dated4 August 2006, or further revisions approved by ANAC, with the intervals stated in that document.2. Alter the aircraft approved maintenance plan to include items 1, 2 and 3 of the Appendix 2, Section A2.4: Critical Design Configuration Control Limitations (CDCCL), as shown in the MRB-145/1150 Revision 10, dated 4 August 2006, or further revisions approved by ANAC, with the restrictions imposed by that document.Note: AGÊNCIA NACIONAL DE AVIAÇÃO CIVIL - BRAZIL AD 2007-08-02 refers. |
| Compliance: | For Requirement 1 - Before 31 December 2008, unless previously accomplished.For Requirement 2 - Within the next 90 days after the effective date of this AD, unless previously accomplished. |
| This Airworthiness Directive becomes effective on 28 August 2008. |
| Background: | Fuel system reassessment, performed according to RBHA-E88/SFAR-88, requires the inclusion of new maintenance tasks in the Critical Design Configuration Control Limitations and in the Fuel System Limitations (FSL), necessary to preclude ignition sources in the fuel system. |
|---|
View image in the official source
James Coyne
Delegate of the Civil Aviation Safety Authority
16 July 2008