This section sets out a practical compliance checklist distilled from the directive text, with precise references to the directive’s elements. It is structured as a stepwise plan an operator or maintenance organisation can follow.
Step 1 , Identify applicability
- Confirm whether any magnetos installed on your aircraft have part numbers listed in Table 1 and whether they are installed on Lycoming AEIO‑540, HIO‑540, IO‑540, O‑540 or TIO‑540 engines (Applicability; Table 1). Note 1 states Table 1 is a partial reproduction of TCM MSB645 Table 1; if your magneto P/N is not listed, consult MSB645 and the engine installation records to ensure applicability.
Step 2 , Determine impulse coupling assembly type and service hours
- For each magneto in scope, determine whether the impulse coupling assembly is riveted or snap‑ring.
- Establish the impulse coupling’s time since new or overhaul (TSN). If TSN is unknown, follow the guidance in Table 2 that treats unknown TSN for riveted assemblies as requiring immediate inspection within 10 hours TIS (Table 2).
Step 3 , Apply initial inspection timing (Table 2)
- If riveted and TSN is 100 or more or TSN is unknown: inspect within 10 hours TIS after the effective date of the Directive (Table 2).
- If riveted and TSN is fewer than 100: inspect before accumulating 100 hours TSN (Table 2).
- If snap‑ring and TSN is 450 or more: inspect within 50 hours TIS after the effective date of the Directive (Table 2).
- If snap‑ring and TSN is fewer than 450: inspect before accumulating 500 hours TSN (Table 2).
Step 4 , Perform the inspection to the specified standard
- Conduct the inspection "using paragraphs 1.2 through 1.4.5 of the Detailed Instructions of TCM MSB645" (Requirement 1). Obtain and retain a copy of MSB645 and ensure authorised maintenance personnel follow the paragraphs exactly.
Step 5 , Take mandatory corrective action
- If the impulse coupling assembly fails the inspection, replace it with a "serviceable riveted or snap‑ring impulse coupling assembly" (Requirement 2). The directive states replacement must be made before further flight after the Requirement 1 inspection (Table 3 commentary). Use the replacement instructions indicated in paragraphs 2 through 2.6 of MSB645 and TCM Service Bulletin 639 (Requirement 2).
Step 6 , Data plate change where applicable
- If you replace a snap‑ring coupling with a riveted coupling, strike out the "A" on the magneto data plate (Requirement 3). Record this in the maintenance log and any continuing airworthiness records.
Step 7 , Schedule repeat inspections
- For riveted impulse coupling assemblies, repeat the inspection within 100 hours time since the last inspection (Table 3).
- For snap‑ring impulse coupling assemblies, repeat the inspection within 500 hours since the last inspection (Table 3).
Step 8 , Consider the optional terminating action
- Evaluate installation of the Shower‑of‑Sparks ignition system as an optional terminating action for repetitive inspection requirements (second HTML block). Review TCM SIL648 (dated 18 October 1994) for information on that modification. If elected, confirm that the conversion satisfies any additional airworthiness and certification criteria applicable to your aircraft type.
Step 9 , Document and retain records
- Keep records showing: identification of covered magnetos (P/N and engine installation), TSN/TIS calculations and evidence, dates and results of inspections in accordance with MSB645 paragraphs, details of any replacements (including P/Ns of new assemblies), data‑plate changes, and any modification/installations of Shower‑of‑Sparks systems. Because the directive references manufacturer instructions and "before further flight" obligations, precise maintenance entries will be necessary for any audit or regulatory inspection.
Step 10 , Reconcile with previous ADs and other guidance
- If prior inspections were performed under AD/ELECT/68 or other ADs, maintain records that demonstrate timing and conformity so repeat intervals under Table 3 can be correctly scheduled (Note 4). If you operate aircraft in multiple jurisdictions, check related FAA AD 2005‑12‑06 (Note 3) and reconcile any jurisdictional differences.
Operational risk management tips
- Check parts availability before scheduling inspections that could reveal failed assemblies requiring "before further flight" replacement. Stock or supplier arrangements for serviceable assemblies will reduce grounding risk.
- If TSN is unknown for older magnetos, prioritise immediate inspection to avoid regulatory default to the stricter initial deadlines.
- Train maintenance staff on the precise paragraphs in MSB645 required by Requirement 1 and ensure shop procedures and checklists reference those paragraphs.
References in the directive that compliance relies on
- Requirement 1 (inspection using TCM MSB645 paragraphs 1.2-1.4.5).
- Requirement 2 (replacement instructions, referring to MSB645 paragraphs 2-2.6 and TCM Service Bulletin 639).
- Requirement 3 (data plate marking).
- Table 1 (affected P/Ns and engine models).
- Table 2 and Table 3 (timing windows).
- Notes 1-5 and Background for context (including reference to SB643B and FAA AD 2005‑12‑06).
Following these steps will align operations with the Directive’s explicit technical and timing demands; where the directive is silent (for example about appeals or enforcement procedures), consult CASA’s wider regulatory documentation for procedural matters beyond the Directive’s technical scope.