| AD/DO 328/65 | Power Plant Air Intake | 10/2006 |
|---|
| Applicability: | Dornier 328-100 series aeroplanes with serial numbers as listed in Dornier 328 Service Bulletins (SB) 328-71-125 Revision 3 or later LBA approved revision and SB-328-71-122 Revision 1 or later LBA approved revision. |
|---|---|
| Requirement: | Replace the air intake and install a by-pass duct outlet cover and carry out visual and tactile inspections in accordance with SB-328-71-122 Revision 1 and SB-328-71-125 Revision 3 or later LBA approved revision.The inspections detailed in this requirement are not required if SB-328-30-242 Revision1 and SB-328-30-274 Revision 1 are incorporated.Note: LBA AD 1995-156/3 refers. |
| Compliance: | Air intake installation within 30 days after the effective date of this AD, unless previously accomplished.Visual and tactile inspections at intervals not to exceed 7 days. |
| This Airworthiness Directive becomes effective on 28 September 2006. | |
| Background: | This AD requires the installation of an improved air intake system with an improved ice protection system. |
View image in the official source
James Coyne
Delegate of the Civil Aviation Safety Authority
14 August 2006