What it does
This instrument is an airworthiness directive (AD) issued by the Civil Aviation Safety Authority under its delegated powers. It mandates structural inspections and, for certain aircraft used in high-stress operations, the installation of reinforcements on fuselage frame 19 of Dornier 228 series aeroplanes. The mechanical requirement is twofold. First, for aircraft with serial numbers 7011 through 7168 and 8012 through 8245 (excluding serial numbers 8107 and 8169) that have accumulated at least 120 short‑field landings in the 1,200 landings before the effective date, an initial inspection for cracks in the lower centre section of frame 19 is due within 800 landings after the effective date. If no cracking is found, the operator must install reinforcements and butt straps on frame 19 in accordance with RUAG Aerospace Services GmbH Service Bulletin SB-228-273 original issue or a later EASA‑approved revision. That installation must be completed before the aircraft accumulates 800 landings after the effective date. If cracking is found, it must be repaired under an EASA‑approved repair solution before further flight. Second, for aircraft in the same serial‑number range that have not met the 120 short‑field landing threshold, the operator must accomplish the same structural inspection within the compliance schedule defined in the Dornier 228 Time Limits/Maintenance Checks Manual. If damage is detected, again it must be repaired to an EASA‑approved standard before further flight. After the initial work, all aircraft in the applicable serial‑number range must repeat the inspection at intervals not exceeding 2,400 landings or 72 months, whichever comes first. For all remaining Dornier 228 aircraft (those outside the specified serial numbers or those with excluded serials), the directive requires only the recurring inspection, with an initial inspection due at the schedule in the manual and thereafter at the same 2,400‑landing or 72‑month interval. The directive is labelled an interim action because investigations into the cause of the cracking were still in progress at the time of issue. The effect is to impose time‑limited compliance costs, record‑keeping burdens (especially tracking short‑field landings), and potential grounding if actions are not completed. It does not create a new right or benefit for operators; it reduces discretion about maintenance scheduling by requiring specific actions by fixed deadlines.