What it does
This airworthiness directive (AD/DHC-8/120 Amdt 1) imposes a mandatory modification on specific Bombardier DHC-8 series aeroplanes to address a systemic failure in the power transfer unit (PTU) control logic. It amends the original AD issued 31 May 2006, which dealt only with interim flight manual changes, by adding a physical rework requirement. The directive becomes effective on 19 November 2009 and applies to Australian registered aircraft Models DHC-8-400, DHC-8-401 and DHC-8-402 within a defined range of serial numbers: 4001, 4003, 4004, 4006 and 4008 through 4184. Aircraft serial number 4185 and subsequent are explicitly removed from applicability because an equivalent modification was already installed during production. Mechanically, the AD requires four steps. First, the operator must amend the Aeroplane Flight Manual (AFM), PSM 1-84-IA, by inserting Temporary Amendment (TA) No. 13 dated 14 July 2005 (or later approved changes). Second, all flight crew must be advised of the changes introduced by the AFM temporary amendment. Third, the operator must modify or rework the PTU control logic by incorporating Modsum 4-126425, using Bombardier Service Bulletin (SB) 84-29-22, Revision A, dated 24 February 2009 (or later revisions approved by Transport Canada). Fourth, once the modification is completed, the operator must amend the AFM by removing TA No. 13. The directive includes a transitional compliance note: for serial numbers 4001 through 4094, accomplishment in accordance with the original issue of SB 84-29-22 dated 5 December 2008 also satisfies the modification requirement. The entire directive is framed around the risk of PTU overspeed resulting from a loss of fluid in the No. 2 hydraulic system, which in at least one reported case caused the system to fail to shut down automatically, leading to a HYD FLUID HOT caution light and potential loss of both hydraulic systems. The original AD (effective 31 May 2006) mandated only the AFM change and crew briefing as interim action. This amendment upgrades the response from procedural mitigation to a hardware fix. It imposes a discrete engineering cost on operators and creates a compliance timeline tied to flight hours rather than calendar days, which shifts the burden from immediate grounding to scheduled maintenance planning.