Several details in this AD can trap the unwary operator or compliance officer.
First, the ramp-compliance time for requirement 3 (inspect up-lock roller for low friction liner) is only 30 days from the effective date (11 May 2006, so due by 10 June 2006). That is a very short window for a fleet of aircraft. Operators must schedule this inspection quickly, and if the aircraft is overseas or in heavy maintenance, they must either arrange for a local approved organisation to perform it or fly the aircraft to a suitable base before the deadline. Flying an aircraft that may have the defective roller is itself a risk, though the AD does not prohibit operation before compliance. However, if the operator fails to meet the 30-day deadline, every subsequent flight is a potential violation.
Second, the distinction between part numbers matters. An aircraft may have been delivered with P/N 46500-3 or -5, but the operator might have already replaced one side but not the other. The terminating action requires both sides to be P/N 46500-7. Replacing only one side provides no relief from the inspection regime; both must be done. Operators who replace only the left assembly thinking they are finished will discover during an audit that the right assembly still requires recurrent inspections. Also, if the aircraft has a mix of -3 and -5, the operator must comply with the more stringent requirement: the groove inspection applies only to -5 assemblies, but the roller liner inspection applies to all.
Third, the wear groove measurement must be made to 0.001 inch accuracy. This requires a precision instrument such as a depth gauge or a special tool. The maintenance manual chapter referenced (32-31-21-220-801) presumably provides the correct procedure, but the AD does not specify what tool to use. An inspector using a crude ruler could misread the depth. If the groove depth is exactly 0.007 inches, the assembly must be replaced. If it is 0.0065 inches, it may remain but must be reinspected at the next interval (400 hours/480 cycles). The tolerance is tight; a measurement error of 0.001 inch could mean the difference between a pass and a costly replacement.
Fourth, the up-lock roller free-rotation check (requirement 4(b)) must be performed at the same interval as the groove inspection. The AD says: “If the up-lock roller does not rotate freely, replace the up-lock roller with a roller of the same part number, as per instructions given in Chapter 32-31-21 of the DHC-8 Series 400 Aircraft Maintenance Manual.” Note: it says “same part number”, which is P/N 46575-1. But requirement 3 already required replacing any roller that lacks the low friction liner. So an operator could end up replacing a roller that rotates freely but lacks the liner (requirement 3) or a roller that has the liner but does not rotate freely (requirement 4(b)). The two inspections are separate and both must be satisfied. A roller can have the liner but still be worn or damaged and fail the rotation check.
Fifth, the AFM amendment procedure is detailed and must be followed exactly. The procedure in requirement 1 involves steps 1 through 11, including a caution that if the LDG GEAR INOP caution light illuminates or there is any hydraulic abnormality, the pilot must revert to the alternate extension procedure. The insertion of this procedure does not remove the existing alternate extension procedure; it adds an intermediate step. Operators must ensure that the pages are inserted in the correct location (opposite page 4-21-1) and that the binder or manual is updated.
Sixth, the compliance calculation for “hours air time” and “flight cycles” must be tracked precisely. If an aircraft accumulates 2,500 hours before 3,000 cycles, the due date is the hour threshold. Operators using a calendar-based tracking system could miss the due date if they rely on cycles alone. Similarly for the 400-hour/480-cycle recurring inspection. The AD does not specify what constitutes a flight cycle: typically one takeoff and one landing. But if an aircraft does multiple touch-and-go landings, each counts as a cycle. The operator must have a system to count cycles accurately.
Seventh, the note about “TC AD CF-2002-13R2” may imply that the Canadian directive is the source, but the Australian AD is the legal requirement in Australia. An operator might mistakenly believe they are compliant if they follow the Canadian directive, but if the Australian version has additional requirements (e.g., the revision to applicability), they could be non-compliant. Always use the local AD.
Eighth, the terminating action is not truly “terminating” if a subsequent AD appears. The AD itself says the terminating action ends the requirements of this AD only. A future AD could require further modifications to the same assembly or to other parts. Operators should not assume that installing P/N 46500-7 provides permanent relief from all landing gear ADs.