The source sets out a small, specific set of actions and timeframes. Below are step-by-step, source-grounded actions an operator or maintenance organisation should follow to comply with the directive as written.
Step 1 , Identify affected airframes and schedule compliance
- Confirm applicability. Verify whether the aircraft is a Model DHC-3. The directive applies to "All Model DHC-3 aircraft" (Applicability). If so, the AD applies.
- Determine whether the inspection or replacement work has already been accomplished at the time of the effective date. The Compliance entries for Requirements 1 and 2 are qualified by "unless already accomplished" (Compliance). If the specified action was completed prior to the effective date, the operator may be able to rely on that completion to meet the AD.
Step 2 , Obtain the referenced technical data
- Acquire de Havilland Service Bulletin No.3/35 Revision A and SB No.3/43 original issue, and identify whether later Transport Canada approved revisions exist. The AD mandates work "in accordance with" those SBs or later Transport Canada approved revisions (Requirement 1; Requirement 2; Requirement 3). Use the SBs as the authoritative instruction set for inspections and replacement procedures.
Step 3 , Perform Inspection required by Requirement 1 (within 50 flight hours after 15 January 2009)
- Timing. Unless already accomplished, the visual inspection must be completed within 50 flight hours after 15 January 2009 (Compliance).
- Scope. Visually inspect the elevator pushrod (C3-CF-167 or replacement C3-CF-633-1), the elevator pushrod to rear quadrant attachment bolt (AN174-16 or NAS1954-24D) and associated hardware. The inspection should concentrate on detection of:
- Bowing of the pushrod;
- Cracking of the pushrod threaded ends;
- Bending of the attachment bolt.
(Requirement 1)
- Action on discovery. If evidence of component damage is found, replace the damaged parts before further flight, in accordance with de Havilland SB No.3/35 Revision A and SB No.3/43 original issue, or later Transport Canada approved revisions (Requirement 1).
Step 4 , Meet Replacement duty of Requirement 2 (within 100 flight hours after 15 January 2009)
- Timing. Unless already accomplished, perform replacement work within 100 flight hours after 15 January 2009 (Compliance).
- Work required. Replace the elevator pushrod to rear quadrant attachment bolt and associated hardware in accordance with SB No.3/43 original issue, or later Transport Canada approved revision. At the same time, unless already accomplished, replace the rudder pushrod to rear quadrant attachment bolt in accordance with SB No.3/43 original issue, or later Transport Canada approved revision (Requirement 2).
Step 5 , Manage part substitution and co-ordination
- Interim use of AN174-16. The directive permits the use of part number AN174-16 in lieu of NAS1954-24D until Requirement 2 comes into effect. If operators choose to retain or install AN174-16 temporarily, plan for the eventual replacement requirement under Requirement 2 (Requirement 1).
- Simultaneous rudder hardware replacement when NAS1954-24D is fitted. If AN174-16 is replaced with NAS1954-24D, replace the rudder pushrod to rear quadrant attachment bolt and associated hardware at the same time in accordance with SB No.3/43 (Requirement 1; Requirement 2). Schedule maintenance to ensure both elevator and rudder attachments are attended to without creating compliance gaps.
Step 6 , Comply with event-triggered Requirement 3 (before further flight after exposure)
- Trigger conditions. If a parked aircraft has been exposed to jet, propeller, or helicopter blast or winds with an estimated mean velocity of 55 km/h with gusting up to 100 km/h, comply with Requirement 1 before further flight (Requirement 3).
- Expanded inspection scope. After exposure to those wind velocities visually inspect the remainder of the elevator control circuit for damage in accordance with de Havilland SB No.3/35 Revision A, or later Transport Canada approved revision (Requirement 3).
- Action on discovery. If damage to any inspected component is found, replace as required in accordance with the SBs prior to further flight (Requirement 1; Requirement 3).
Step 7 , Technical conformity and documentation
- Follow the SBs. All inspections and replacements must be done "in accordance with" the specified de Havilland Service Bulletins, or later Transport Canada approved revisions (Requirement 1; Requirement 2; Requirement 3). Ensure the SB revision used is either the one cited or a Transport Canada approved later revision.
- Record the work. Although the AD text does not specify record-keeping, standard aviation practice requires maintenance entries in the aircraft logbook and maintenance release documentation consistent with the SBs and applicable maintenance regulations. Record the inspection results, parts replaced (including part numbers C3-CF-167/C3-CF-633-1 and AN174-16/NAS1954-24D where applicable), and the SB revision used.
Step 8 , Logistics and cost planning
- Parts procurement. Identify suppliers for the specified pushrod and bolt part numbers. The directive’s part references must be matched precisely when replacement is required by the SBs (Requirement 1; Requirement 2).
- Labour and scheduling. Plan for the labour time required to inspect and, where necessary, replace bolts and pushrods and to inspect the remainder of the elevator control circuit after gust exposure. If NAS1954-24D is being fitted, schedule simultaneous rudder hardware replacement to comply with the simultaneous replacement requirement (Requirement 2).
Step 9 , Operational practices
- Prompt pre-flight checks after storm exposure. Implement procedures to identify when parked aircraft have been exposed to blast or high winds so that Requirement 3 is applied before further flight (Requirement 3).
- Conservative judgement. Given the estimation component of wind speed thresholds, adopt a conservative approach when in doubt; treat potential exposures as triggers for Requirement 3 inspections.
Step 10 , Monitor for updated SB approvals
- Transport Canada approved revisions. The AD permits the use of later Transport Canada approved revisions of the referenced SBs. Monitor Transport Canada and the SB issuer for approved revisions and, when a Transport Canada approved revision supersedes the cited SB, adopt that revision for compliance (Requirement 1; Requirement 2; Requirement 3).
Who pays and who decides
- The source places the responsibilities operationally on the aircraft operator and maintenance organisations, which will incur costs for inspections, parts and labour. The directive does not provide funding or cost-sharing arrangements (Applicability; Compliance).
- Responsibility for technical conformity decisions (which SB revision to use, whether later Transport Canada approved revisions exist) rests with the operator and maintenance organisation, subject to the SBs and the Transport Canada approval caveat set out in the directive (Requirement 1; Requirement 2).
This stepwise approach mirrors the directive’s text and timing requirements and ties all technical actions to the de Havilland SBs and Transport Canada approved revisions as specified in the AD.