What it does
This instrument is an airworthiness directive published under the Commonwealth of Australia heading for Civil Aviation Regulations 1998, Part 39 - 105, in the Civil Aviation Safety Authority schedule of Airworthiness Directives. It applies to Douglas DC‑3 series aeroplanes and mandates a specific maintenance change. The directive requires that the inspection program set out in McDonnell Douglas Report L26‑013, titled “DC‑3 Supplemental Inspection Document” (SID), be incorporated into the maintenance schedule for the aircraft. The AD gives a hard compliance deadline: the SID inspection program must be incorporated before 26 May 1995. The directive explicitly states it is applicable to “All Models” of the DC‑3 series. The document presents a short background stating that McDonnell Douglas produced the SID to ensure the continued safety of older DC‑3 aircraft, and that this Airworthiness Directive “mandates the application of the inspection program to Australian registered aircraft.”
Mechanically, the instrument does three things in the text supplied: it identifies the affected type (Douglas DC‑3 series), it specifies the source and content of the new inspection requirement (McDonnell Douglas Report L26‑013, the SID), and it imposes a compliance deadline (incorporate before 26 May 1995). The text does not set out inspection intervals, inspection tasks, or the content of the SID itself; it requires incorporation of the SID into the aircraft’s maintenance schedule, which presumes the SID contains the detailed procedures and intervals. The directive names the manufacturer document as the mandatory reference to be adopted by operators of Australian registered DC‑3s.
The AD does not include penalties, appeal routes, exemptions or alternative means of compliance within the text provided. It identifies the regulatory context in its header but leaves the enforcement and procedural detail to the broader regulatory framework or to the SID itself. The direct obligation in the text is limited and specific: adopt the SID into the maintenance schedule by the stated date for Australian‑registered DC‑3 aircraft.