Compliance with AD/DAUPHIN/4 Amdt 5 requires a systematic approach integrated into the aircraft’s continuing airworthiness management system. The first step is to confirm the aircraft model and modification status. Check the helicopter’s type certificate data sheet and maintenance records to verify whether modification AMS 365A.07.2457 (including the 1.6 mm chemically milled fairing plate) or Service Bulletin 53.09 has been embodied. If the modification is shown as incorporated, use the intervals for modified aircraft; if not, use the 25-hour visual inspection interval for the fairing plate. The second step is to schedule the inspections in the maintenance program. The fairing plate visual inspection (Requirement 1) is due at 100 hours if modified, 25 hours if unmodified. The detailed external and internal visual inspection of the fin to tailboom attachment structure (Requirement 2) is due at each 100-hour S inspection. The X-ray inspection (Requirement 3) has an initial threshold: before the finger doubler exceeds 500 hours total time in service, or before exceeding 500 hours after a CAR 35 repair (whichever is later), and then every 100 hours at the S inspection. The operator must track the total time on the finger doubler. If the doubler is a new replacement, the total time resets to zero for that part, but the AD does not explicitly address this; conservatively, treat the replacement as a new part starting at zero hours. If the aircraft has had a repair, the operator must ensure the repair design includes a re-verification of inspection effectiveness and that the 500-hour clock starts from the repair date. The third step is to perform the inspections using approved methods. For the fairing plate visual inspection, the operator must strip the paint unless the plate is coated with clear lacquer. If lacquer is used, ensure it remains clear and undamaged; a degraded lacquer coating may necessitate repainting and then stripping. The paint stripping and lacquer application must be done by personnel qualified to handle aircraft coatings, with proper chemical disposal. The visual inspections (Requirements 1 and 2) must be “detailed,” meaning a thorough visual examination with adequate lighting and magnification if necessary, following the guidance in Service Bulletin 05.04 and the manufacturer’s instructions. The X-ray inspection must follow NDT Procedure RAD/DAUPHIN/4 or an alternative scheme approved by CASA. To avoid delays, obtain CASA approval for any alternative before the inspection is due. The NDT procedure must be performed by a certified NDT technician with appropriate radiation safety credentials. The fourth step is to document all inspections. For each inspection, record the date, hours on the component, results (crack found or not), and the identity of the inspector. If cracks are found, the operator must take corrective action. The AD does not specify repair limits; it requires that any repair to the finger doubler be CAR 35 designed and approved and include re-verification of inspection effectiveness. The operator should consult the manufacturer’s structural repair manual or obtain a design approval from CASA or a delegated design organisation. For cracks in other components (rib, stringers, end flange), the operator should follow the manufacturer’s instructions or an approved repair scheme. The fifth step is to maintain ongoing compliance. The X-ray inspection repeats every 100 hours after the initial threshold, and the visual inspections repeat at their respective intervals. Operators should use a maintenance tracking system that flags upcoming AD tasks based on hours in service. If the aircraft is operated intermittently, calendar-based monitoring may also be prudent, though the AD only specifies hours-based intervals. The sixth step is to consider whether to vary the intervals using fracture mechanics analysis. The background notes that CASA will consider variations if such an analysis is submitted. An operator with a large fleet could commission a damage tolerance analysis to potentially extend the inspection intervals, reducing long-term compliance costs. However, this analysis must be accepted by CASA, and the operator should budget for engineering consulting fees and potential regulatory delays. The seventh step is to ensure that any outsourced maintenance work is performed at a facility that is familiar with this AD. Provide the full AD text to the maintenance organisation and confirm they have the necessary NDT capability and CASA approval for the X-ray procedure. The eighth step is to keep the lacquer option in mind: if the operator decides to use clear lacquer on the fairing plate, they must ensure that the lacquer is a type that does not hide cracks and can be easily removed if needed. The AD does not specify a particular lacquer; it only requires a “suitable clear lacquer.” The operator should use a product recommended by the manufacturer or approved by CASA. Finally, regularly review the CASA website for any further amendments to this AD or for any new ADs on the Dauphin series, as the fatigue issue may continue to evolve.