Compliance with AD/CRESCO/10 requires a systematic approach. The following steps are a practical guide for the operator or AMO.
Step 1: Determine applicability. Confirm that the aircraft is a Cresco 08-600 operated in the restricted category for agricultural operations. Check the aircraft’s type certificate and maintenance records. Then identify the P/N of each MLG axle installed. This will require reference to the aircraft parts catalogue or logbook. If the P/N is one of the three listed, the AD applies. If the P/N is different, the AD may not apply, but record why.
Step 2: Establish baseline compliance status relative to 15 February 2007. The initial compliance dates depend on hours and landings accrued on those specific axles as of the effective date. For each axle, calculate:
- Total time in service (airframe or axle hours).
- Total landings (including the landing during which a crack might have occurred).
Then apply the “unless already accomplished” look-back provisions. For example, if a security inspection (step a) was done within the last 150 hours of time in service before 15 Feb 2007, it is current; otherwise, schedule it before the cumulative limit (150 hours after 15 Feb, or 1,500 landings from the axle’s start). The same logic applies to visual and NDT.
Step 3: Organise the work. The AD requires disassembly of the MLG wheel assembly. Ensure the AMO has the proper tools and the current revision of PAC Cresco 08-600 MM Chapters 32 and 12, as well as PACSL/CR/06-1 Revision 1, and the specific supplement (PAC/CR/0442 or PAC/CR/0443) for the axle P/N. Also obtain the ASTM E-1444 standard or an equivalent approved method.
Step 4: Perform inspections in order. Sequence (a) security inspection per Chapter 05-10-00 page 615. This checks axle security, likely torque and fasteners. Then (b) visual inspection per the service letter tables for the specific P/N. Focus on shoulder radii as directed. Then (c) NDT: magnetic particle for -1 and -2 axles; dye penetrant for -3 axles. Record any findings. If cracks are detected, replace the axle before further flight. Use only approved replacement parts (the current P/N, with torque plates for -2 and -3). After replacement, reassemble and lubricate per MM Chapters 32 and 12.
Step 5: Torque plate compliance. If the aircraft has -2 or -3 axles, verify that torque plates P/N 08-40055-2 and 08-40056-2 are installed. If not, install them. This is a one-time requirement; thereafter they remain with the axle.
Step 6: Document all actions in the aircraft maintenance logbook. Enter the date, aircraft hours/landings at compliance, the axle P/N, the inspection method used, any cracked findings and replacements, and the next due intervals. Use a maintenance schedule system to track the recurring intervals (e.g., a 150-hour/1,500-landing calendar for security, etc.). Track landings separately from hours; many agricultural strips result in high landing counts.
Step 7: Plan for ongoing compliance. Set up reminders in the maintenance program. Since intervals differ, a single spreadsheet or maintenance tracking software should calculate due dates based on whichever threshold occurs first. Note that the NDT intervals for -1 and -2 are based on landings (6,000) with no hour limit, so if the aircraft flies low and slow with many short flights, landings will be the limiting factor. For -3, the first dye penetrant is at 50,000 landings - a very high threshold - then repeats at 6,000 landings.
Step 8: Monitor for updates. Check the CASA website for any amended or superseding ADs. If the manufacturer issues a new service letter or if the maintenance manual is revised, the AD remains in force but the detailed instructions may change. Ensure the AMO is using current data.
Step 9: If facing operational difficulties, consider alternative means of compliance. Under CASR Part 39, an operator may apply to CASA for approval of an alternative method if it provides an equivalent level of safety. For example, extending an interval based on fleet data or using an ultrasound method instead of magnetic particle. This is a formal process requiring evidence and likely delays.
Step 10: Budget for costs. Over 16 years of adherence, the costs accumulate. Each inspection cycle requires labour (disassembly, cleaning, NDT, reassembly), possibly replacement parts if cracks found, and aircraft downtime. For a typical Cresco flying 200 hours per year with, say, 500 landings, the security inspection would be needed roughly every 9 months (150 hours) or 3 years (1,500 landings) whichever first. The magnetic particle for -1 would be needed every 2.5 years (500 hours) or 12 years (6,000 landings) - but the hours limit will dominate. For -2, only landings matter: 6,000 landings might take many years. For -3, the first dye penetrant at 50,000 landings may never be reached in the aircraft’s lifespan. So the compliance burden depends on the axle P/N and usage pattern. Operators with -1 axles face the most frequent NDT. Upgrading to -3 axles, even at the cost of torque plates, could drastically reduce inspection frequency - a rational cost-benefit decision.