What it does
This Airworthiness Directive (AD/CONVAIR/11, dated 5/2006 and effective 11 May 2006) mandates inspection and corrective action for the main windshield lower longeron splice channel, part number 340-3110113-15, on Convair/General Dynamics Kelowna Flightcraft series aeroplanes Model 340 and 440, and on all such models converted to turbopropeller power (Applicability). The AD requires operators to inspect the splice channel for cracks in accordance with General Dynamics 640 (340D) Service Bulletin No. 53-3, dated 24 April 1970 (Requirement 1). If cracks are not detected on inspection, the AD requires repeated inspections at specified intervals (Requirement 2 and Compliance: 2). If cracks are detected, the AD gives operators two alternative courses of action: replace the channel with a new channel and perform the post-replacement inspections set out in Requirement 4, or implement a set of interim operational mitigations while arranging replacement (Requirement 3.a and 3.b).
The interim mitigation under Requirement 3.b requires three concurrent actions: (i) install a placard on the instrument panel in full view of both pilot and co-pilot limiting operation to a maximum of 18,000 feet above sea level, (ii) change the cabin pressure relief valve nominal setting to 3 psi, and (iii) conduct visual inspections of adjacent areas in accordance with SB No. 53-3 until the channel is replaced (Requirement 3.b(i)-(iii)). If an operator elects the mitigation option, the AD imposes a firm replacement deadline: a cracked channel must be replaced with a new channel within 1,000 hours time in service from detection of cracking, and replacement must take place before further flight if any cracking of adjacent structure is detected during any repetitive inspection (Requirement 3.b and Requirement 3.a/3.b combined).
The AD sets precise compliance timings. The initial inspection must be carried out unless already done, within 150 hours time in service after 11 May 2006 or before the accumulation of 10,000 hours time in service, whichever occurs later (Compliance: 1). Repetitive inspections are required at intervals not to exceed 2,000 hours time in service after the initial inspection (Compliance: 2). If an operator uses the mitigation path, the visual inspections of adjacent areas must be at intervals not exceeding 150 hours time in service until the channel is replaced (Compliance for Requirement 3.b(iii)). Once a cracked channel has been replaced with a new channel, the AD allows resumption of normal inspection intervals for a period of 10,000 hours time in service, with inspections thereafter not to exceed intervals of 2,000 hours time in service (Requirement 4 and Compliance: 4). The AD expressly identifies the safety hazard it addresses: undetected cracking could result in failure of the windshield support structure and consequent loss of pressurisation (Background).