What it does
This Airworthiness Directive (AD/CONVAIR/1, number 4/2006) issued by the Civil Aviation Safety Authority (CASA) mandates a series of mandatory inspections, replacements, and modifications to the horizontal stabiliser attachment fittings on Convair 340 and 440 series aeroplanes, including all such models converted to turbopropeller power. The directive is grounded in requirements originating from the United States Federal Aviation Administration (FAA) AD 82-19-02 (Amendment 39-4458) but is adopted directly into Australian law as a CASA-issued AD. Mechanically, the instrument imposes six coordinated actions. First, a visual inspection of the upper and lower, forward and aft, horizontal stabiliser attachment fitting lugs per the Accomplishment Instructions of General Dynamics Convair Division Service Bulletin 640 (340D) 55-3A Revision 1. Second, an ultrasonic inspection of those same lugs per the same bulletin. If cracks are found during either inspection, the fitting must be replaced with a new part before further flight. Third, bushings must be installed in the lug holes per Service Bulletin 640 (340D) 55-3A, regardless of crack findings (unless already accomplished). Fourth, an internal visual inspection for cracks in the horizontal stabiliser attachment fittings (upper and lower, forward and aft) and associated structure outboard of the lugs and butt rib, focusing on fasteners and rivets, per Service Bulletin 640 (340D) 55-4 Revision 1. Loose rivets or fasteners trigger replacement or repair before further flight. Fifth, an x-ray inspection specifically of the upper forward and upper aft fittings (the four most heavily loaded in tension) per the same bulletin, with crack findings requiring part replacement. Sixth, replacement of the first three steel rivets outboard of the butt rib through the two forward upper fittings per Service Bulletin 640 (340D) 55-4. The directive imposes initial compliance intervals ranging from 250 hours time in service after 13 April 2006 (the effective date) to a default deadline of 10,000 hours time in service after 16 September 1982 (the FAA AD effective date) for the bushing and rivet replacements that were presumably required to have been done much earlier under FAA rules. Thereafter repetitive inspections at intervals of 700 or 1400 hours time in service apply, depending on the specific requirement. The directive thus forces aircraft operators to disrupt scheduled operations, access specialised inspection services (ultrasonic and x-ray), source new parts, and maintain detailed hour-tracking records for each airframe. Failure to comply renders the aircraft unairworthy and ineligible for a certificate of airworthiness or maintenance release.