CTHIn ForceLegislation
AD/CON/90 Amdt 1 - EQ3 Cylinders - Inspection for Cracks
Teledyne Continental Motors Piston EnginTeledyne Continental Motors Piston Engines
Start here
Get a plain-English read of Teledyne Continental Motors Piston Engin
Turn the raw legal text into a practical explanation grounded in AD/CON/90 Amdt 1 - EQ3 Cylinders - Inspection for Cracks.
Teledyne Continental Motors Piston Engines
| AD/CON/90 Amdt 1 | EQ3 Cylinders - Inspection for Cracks | 12/2009 |
|---|
| Applicability: | Teledyne Continental Motors (TCM) O-470, IO-470, TSIO-470, IO-520, TSIO-520, IO-550 and IOF-550 reciprocating engine models listed in Table 1 of this Directive that have one or more affected TCM cylinders installed.To identify the affected cylinders, cross reference the engine models in Table 1 of this Directive with the engine serial numbers found in Tables 1, 1A, 2 and 2A of TCM Mandatory Service Bulletin (MSB) No. MSB09-1B, dated 14 July 2009. Use the tables found in MSB09-1B to also identify spare EQ3 cylinders by cylinder part number and cylinder serial number that may have been installed on these engines. |
|---|---|
| Table 1 - Affected Engine Models | |
| O-470-G, K, L, R, S, M, U | |
| IO-470-C, D, E, F, H, L, M, N, S, U, V, VO | |
| TSIO-470-B, C, D | |
| IO-520-A, B, BA, BB, C, CB, D, E, F, J, K, L, M, MB | |
| TSIO-520-AF, B, BB, C, CE, D, DB, E, EB, G, H, J, JB, K, KB, L, LB, M, N, NB, P, R, T, UB, VB, WB | |
| IO-550-A, B, C, D, E, F, L | |
| IOF-550-B, C, D, E, F, L | |
| Note 1: These engines are installed on, but not limited to, Alexandria Aircraft LLC (formerly Bellanca) model 300 Super Viking; Beech Bonanza 33, 35 and 36 series, Beech Baron 56 and 58 series, Cessna 180, 182, 188, 205, 206, 207, 210, 303, 310, 320, 402 and 414 model series; Aero Commander 200 and 500; certain Rockwell (formerly Meyers) Windecker Eagle 200 and Navion aeroplanes. | |
| Requirement: | 1. Identify EQ3 cylinders using Step 1 of MSB09-1B. |
| 2. For EQ3 cylinders with 400 or more hours total time of operation on the effective date of this Directive, perform an initial visual inspection of the cylinder for cracks using Step 2, paragraph B, of MSB09-1B. | |
|---|---|
| 3. For EQ3 cylinders with fewer than 400 hours total time of operation on the effective date of this Directive, perform an initial visual inspection of the cylinder for cracks, using Step 2, paragraph B, of TCM MSB09-1B. |