What it does
This Airworthiness Directive (AD/CL/600/79) imposes mandatory inspection, recording, reporting, and replacement obligations on operators of Bombardier Inc. Model CL/600/2B19 (CRJ/100/440) aeroplanes with serial numbers 7003 and subsequent. It addresses a safety concern arising from Transport Canada reports of aileron power control unit (PCU) link failures on several in/service aircraft. The directive treats a single link failure as a dormant failure, meaning it may not be immediately apparent to the flight crew, but failure of both PCU links to one aileron could reduce lateral control of the aeroplane.
Mechanically, the AD requires five actions: first, a detailed visual inspection of four aileron PCU links for fractures or cracks, with immediate replacement of any defective link before further flight. Second, as part of any replacement the operator must record the torque value of the forward and aft attachment bolts for both PCU links on the applicable aileron, check for mismatch between the PCU link and the PCU output fork, and perform an eddy current (nondestructive testing / NDT) inspection of the aileron PCU lugs. If a crack is found in a lug, Bombardier must be contacted in accordance with the referenced Alert Service Bulletin (ASB). Third, certain credit is given for inspections already performed under the original ASB A601R/27/130 dated 13 November 2003, but any aircraft that had a fractured or cracked link without an NDT inspection of the lugs must have that NDT carried out at the next repeat visual inspection. Fourth, the information recorded in Appendix A and Appendix B of the ASB (or later National Airworthiness Authority approved revision) must be forwarded to Bombardier Aerospace within 30 days of the initial inspection, together with any fractured or cracked links. Fifth, the entire inspection and checks cycle must be repeated at intervals not exceeding 1000 flight hours.