The AD is constructed around a small set of operationally significant concepts: applicability by serial number, part and assembly identification, conditional inspection triggers, inspection methodology and repeatability, re‑identification as an administrative closeout, and installation restrictions.
Applicability and identification: The AD applies only to Bombardier CL-600-2B16 (CL-604) aircraft with S/Ns 5408-5665 (Applicability). The starting action is an identification check of the ADG P/N and, where applicable, the ADG S/N and the S/N of the strut and generator housing assembly (Requirement 1). Note 1 explicitly permits the identification check to be done visually (which may require lowering the ADG) or by reviewing maintenance records (Note 1). The AD therefore relies on the combination of physical marking and maintenance record integrity to classify each ADG into action categories.
Conditional inspection triggers: The AD uses a decision tree in Requirement 1. If the installed ADG is the later P/N 604-90800-23, the strut wall thickness is deemed within specification and no further action is required. For ADGs with older P/Ns in the 761339 series, the AD requires different responses depending on S/N ranges: certain S/N thresholds (ADG S/N ≥ 2000, or S/N 0101-1999 when marked with symbol 24‑3) are treated as safe, requiring only re‑identification; other S/N combinations require an initial fluorescent penetrant inspection (Requirement 1.b.i-iii and associated subparts A and B).
Fluorescent penetrant inspection methodology: The AD mandates a fluorescent penetrant inspection of the ADG strut when S/Ns fall into the high‑risk ranges (Requirement 2). The required inspection and replacement procedures are to be performed in accordance with the Accomplishment Instructions of Bombardier Alert SB 604‑24‑017 Rev 1, or later revisions approved by the Chief, Continuing Airworthiness, Transport Canada (Requirement 2). Table 1 lists prior SB issues and Hamilton Sundstrand SB revisions which the AD accepts as meeting the intent of Requirement 2.
Repeat inspections and inspection after deployment: The AD requires repeat penetrant inspections before further flight after each scheduled ADG operational test (Requirement 3) and prescribes inspections following unscheduled ADG deployments: Requirement 4 triggers a visual and/or penetrant inspection after unscheduled in‑flight deployment, with specified deadlines (before further flight for visual, within 72 hours or 10 hours air‑time for penetrant in 4b). Requirement 5 requires a visual inspection after unscheduled on‑ground deployments.
Re‑identification closeout: Where P/N/S/N combinations indicate the strut wall thickness is within specification, the operator must re‑identify the ADG per Bombardier SB‑604‑24‑019 or approved Hamilton Sundstrand SB revisions (Requirement 6). After re‑identification, "no further action is required and compliance with this AD is complete" for those ADGs (Requirement 6 and Note 9).
Parts installation restriction: The AD forbids installation of specified ADGs (P/N 604-90800-1, -17, -19; Hamilton Sundstrand P/N 761339 series) into aircraft where the ADG S/N and the strut/generator housing assembly S/N fall into the risky ranges (ADG S/N 0101-1999 and assembly S/N 0001-2503), from the effective date of the AD (Requirement 7). An exception allows reinstallation of the same ADG onto the same aircraft if it was removed for non‑related purposes, such as maintenance or to gain access to other components (Requirement 7, Note 10).
References and cross‑document compliance: The AD anchors its inspection and re‑identification work to specific manufacturer service bulletins and notes that prior accomplishment in accordance with identified SBs (Bombardier and Hamilton Sundstrand) meets the intent of the AD (Table 1, Notes, and statements in Requirements 2 and 6). The AD also notes Transport Canada AD CF‑2009‑24 (Note 11), and requires that later SB revisions be approved by the Chief, Continuing Airworthiness, Transport Canada before they are used to meet the AD.
Timing and effectiveness: The AD specifies compliance windows for each requirement and becomes effective on 30 July 2009 (Compliance; Effective date). The timing structure mixes near‑term actions (within 400 flight hours or next scheduled ADG operational test) with immediate post‑event actions (before further flight or within short hour windows after an unscheduled deployment).
The AD therefore operationalises risk reduction through targeted inspection and administrative controls, deploying technical standards (fluorescent penetrant inspection as per SBs), serial‑number gating, and a parts installation bar to prevent introduction of potentially defective castings into the fleet.