Compliance is a multi‑step process that involves identification, planning, execution, and recordkeeping.
Step 1: Determine applicability. The operator must first confirm the aircraft model and serial number. This should be done by reference to the aircraft’s Certificate of Registration and the type certificate data sheet. The AD applies only to CL‑600‑2C10 serial numbers 10003 and subsequent, and CL‑600‑2D15 and CL‑600‑2D24 serial numbers 15001 and subsequent. However, the specific requirements have narrower ranges. The operator should create a checklist:
- Is the aircraft one of the listed models? If yes, note the serial number.
- For Requirement 1: is the serial number in the range 10003‑10223 (‑2C10) or 15001‑15035, 15038, 15039, 15042 (‑2D15/‑2D24)? If yes, proceed.
- For Requirement 2: is the serial number in the range 10003‑10239 (‑2C10) or 15001‑15057 (‑2D15/‑2D24)? If yes, proceed.
- For Requirement 3: all aircraft with serial numbers 10003 and subsequent (‑2C10) and 15001 and subsequent (‑2D15/‑2D24) are subject to the spare part prohibition. This applies regardless of whether they have met Requirements 1 or 2.
Step 2: Check maintenance records. Examine the aircraft logbooks and historical records to see if Requirements 1 or 2 have already been accomplished under the original SB or the accepted alternatives. Look for entries referencing SB 670BA‑32‑019, original issue or Revision A, or REO 670‑32‑11‑0022, or Goodrich SCR 0056‑05. Also check if the apex nut has been replaced (Requirement 2) as that waives Requirement 1. If records show compliance, no further action is needed for those requirements, but the operator should still verify the records are complete and correct.
Step 3: Plan the work. For Requirement 1, schedule a detailed visual inspection at or before 900 flight hours from the effective date (30 July 2009). Since the AD is old, any surviving affected aircraft will have long passed 900 flight hours; the operator must ensure the inspection was done in the past. If not, immediate grounding and compliance are needed. For Requirement 2, schedule the nut replacement at or before 4,500 flight hours. Most aircraft will have also passed that, so the work should be verified. For Requirement 3, check inventory of spare main landing gear shock strut assemblies: any with P/N 49000‑11 to 49000‑22 and serial number 0001‑0284, or P/N 49050‑5 to 49050‑10 and serial number 1001‑1114, must be reworked per SB 670BA‑32‑019 Revision A (or later Transport Canada‑approved revision) before they can be installed. If the spare part is already reworked, it is eligible.
Step 4: Obtain the service bulletin. The operator or maintenance organisation must obtain the latest approved revision of Bombardier SB 670BA‑32‑019. As of the AD, Revision A is the baseline. If a later revision exists and is approved by Transport Canada, that may be used. The operator should verify with the distributor or Transport Canada that the revision is approved. It is not sufficient to download any version from a website.
Step 5: Perform the inspection and replacement. The work must be carried out by an appropriately licensed aircraft maintenance engineer (LAME) or an approved maintenance organisation (AMO) under CASR Part 145. The tasks are detailed in the SB. The inspection is a one‑time detailed visual of the torque link apex joint. The replacement/rework involves the apex nut. The rework of shock strut assemblies for spare parts must also follow Part B of the SB. The operator should ensure that the inspector or engineer understands the specific serial number applicability and the difference between requirements.
Step 6: Document compliance. After the work, the maintenance release must reference this AD (AD/CL‑600/112) and the service bulletin used. The aircraft logbook entry should record: the AD number, the requirement satisfied (1, 2, or both), the date, the flight hours at compliance, the SB revision used, the part numbers and serial numbers of any replaced components, and the signature of the certifying person. For spare parts, the rework should be recorded on the part’s maintenance tag and in its history.
Step 7: Manage spare parts inventory. For Requirement 3, any affected shock strut assemblies that have not been reworked must be either sent for rework or disposed of. The operator should maintain a register of spare landing gear assemblies and their compliance status. Before any installation, the mechanic must check that the part is eligible under this AD.
Step 8: Monitor for later revisions. Although the AD is effective from 2009, operators should periodically check with Bombardier or Transport Canada to see if later SB revisions have been approved. The AD allows the use of approved later revisions, which could simplify compliance (e.g., a new revision may provide an easier inspection method). The operator is not required to adopt later revisions, but doing so may reduce cost or improve safety.
Step 9: Seek AMOC if necessary. If the operator cannot comply with any requirement (e.g., the aircraft has a unique modification that conflicts), application should be made to CASA for an alternative means of compliance under CASR 39.008. This should be done well in advance of the compliance deadline.
Step 10: Retain records indefinitely. Continued airworthiness requires that AD compliance records be kept for the life of the aircraft. The operator should ensure that records are transferred if the aircraft is sold or leased. Failure to produce records can result in the need to repeat the work.
By following these steps, the operator will be in compliance with the AD. The cost and effort are modest for most operators, but the prohibition on spare parts may catch those with older inventory. The key is to verify records and serial numbers accurately, and to use the correct service bulletin revision.