What it does
This airworthiness directive (AD) AD/CF6/57 Amdt 1, issued by the delegate of the Civil Aviation Safety Authority (CASA), imposes a mandatory modification to the inspection schedule for General Electric CF6-80C2 turbofan engines. It requires a one-time flex-boroscope inspection of high pressure turbine (HPT) stage 2 nozzle guide vanes (NGVs) that have specific part numbers and that meet certain repair or modification conditions. The AD then sets ongoing reinspection intervals or removal requirements determined by the condition found during that initial inspection, as detailed in GE Service Bulletin CF6-80C2 S/B 72-0952, Revision 6 dated 5 May 2003.
Mechanically, the AD operates in three phases. First, it establishes initial inspection thresholds measured in HPT cycles-since-overhaul (CSO) that depend on the engine model. For most CF6-80C2A and B series engines the threshold is 800 CSO; for the A2, B2 and B2F variants it is 1,600 CSO. If an engine has already exceeded its threshold by the effective date of the original AD (20 January 2005), the operator must inspect within 200 additional CSO. Second, the AD directs the operator to follow the reinspection or removal instructions in Figure 5 of the GE Service Bulletin, which classifies cracking severity and mandates either reinspection at the next regular S2 blade inspection or removal from service. Third, the AD clarifies the meaning of “next regular S2 blade inspection”: for CF6-80C2D1F engines operated at 5.0 or more hours per flight leg, that interval is 250 cycles-since-last-inspection (CSLI); for all other affected engines it is 400 CSLI. This clarification is the sole change made by Amendment 1 compared to the original January 2005 version.
The AD is triggered by a known risk: an uncontained engine failure that the background attributes to HPT S2 NGV distress. The stated purpose is to prevent blade separation from the NGVs, which could cause a similar failure. The directive applies only to engines that have certain NGV part numbers and that have had specific inserts installed (P/N 1957M40G01 or 1957M40G02) during repair or modification, or that were repaired by GE between 1 April 1998 and 30 September 1999. The AD therefore imposes a direct condition‑of‑use burden on operators: they must inspect these vanes earlier than they otherwise would under the engine manufacturer’s standard maintenance schedule. The cost of the initial inspection, the potential downtime for removal and replacement, and the record-keeping overhead are all compliance costs that fall on the operator, not on the manufacturer or the regulator. The AD does not provide for reimbursement or cost sharing; it is a unilateral safety mandate that overrides the operator’s discretion in scheduling maintenance.