Sourced from the Federal Register of Legislation (legislation.gov.au), CC BY 4.0.
Requirement: 1. NGVs Previously Inspecte Requirement: 1. NGVs Previously Inspected by Flex Borescope before the effective date of this Directive:
Requirement: 1. NGVs Previously Inspected by Flex Borescope before the effective date of this Directive:
Reinspect or remove from service the NGVs.
2. NGVs Not Previously Inspected by Flex 2. NGVs Not Previously Inspected by Flex Borescope:
2. NGVs Not Previously Inspected by Flex Borescope:
Remove from service, or re-inspect using the Accomplishment Instructions of GE SB No. CF6-80E1 S/B 72-0217, Revision 2, dated 5 January 5 2004.
Note 3: FAA AD 2004-09-34 Amdt 39-13625 refers.
Compliance: For Requirement 1: Unless previously accomplished in accordance with the Conditions and Reinspection intervals listed in the "Inspection Table for Cracking in the Airfoil Outer Fillet," Figure 5, of GE Service Bulletin (SB) No. CF6-80E1 S/B 72-0217, Revision 2, or within 200 cycles-in-service-since-last inspection (CSLI), whichever is earlier.
For Requirement 2: For NGVs with more than 800 cycles-since-overhaul (CSO) on the effective date of this AD, within 50 cycles-in-service (CIS) after the effective date of this AD; thereafter in accordance with the Conditions and Reinspection intervals listed in the "Inspection Table for Cracking in the Airfoil Outer Fillet," Figure 5, of GE SB No. CF6-80E1 S/B 72-0217, Revision 2.
General Electric Turbine Engines - CF6 S General Electric Turbine Engines - CF6 Series
General Electric Turbine Engines - CF6 Series
AD/CF6/48 Amdt 1 (continued)
For NGVs with 800 or fewer CSO on the effective date of this AD, at the first regular HPT blade inspection after 800 CSO, but before reaching 900 CSO; thereafter in accordance with the Conditions and Reinspection intervals listed in the "Inspection Table for Cracking in the Airfoil Outer Fillet," Figure 5, of GE SB No. CF6-80E1 S/B 72-0217, Revision 2.
For the purposes of this AD, cycles-since-overhaul (CSO) is defined as cycles since repair as described in GE SB No. CF6-80E1 S/B 72-0164 dated 16 March 1999.
The original issue of this Directive became effective on 20 February 2003. This Amendment becomes effective on 30 September 2004.
Background: An uncontained failure has been attributed to high-pressure turbine stage two nozzle guide vane distress. This directive introduced an inspection program to identify early signs of distress.
This amendment reduces the inspection interval, because it has been determined that the cracks that develop could grow at a faster rate than originally expected.