AD/CF6/28 - CF6-80C2 Stage 1 High Pressure Turbine Disc Inspection
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 106 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
View image in the official source General Electric Turbine Engines - CF6 Series
AD/CF6/28 CF6-80C2 Stage 1 High Pressure Turbine Disc Inspection
7/94
Applicability: CF6-80C2 Engines.
Requirement: Action in accordance with the technical requirements of FAA AD 94-06-03.
Note: General Electric Service Bulletin No 72-614 Revision 1 and All Operator’s Wire 92-80C-16 of 22 April 1992 refer.
Compliance: This directive is effective from 27 Jun 1994.
Background: This directive requires an inspection for cracks in the stage 1 high pressure turbine disc rim bolt holes and replacement as necessary with serviceable parts.
It originates from an uncontained stage 1 high pressure turbine failure.