AD/CESSNA 550/8 - Nitrogen Bottle Installation - Inspection
1AD/CESSNA 550/8 - Nitrogen Bottle Installation - Inspection
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/CESSNA 550/8 - Nitrogen Bottle Installation - Inspection.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Cessna 550 (Citation II) Series Aeroplanes
AD/CESSNA 550/8 Nitrogen Bottle Installation - Inspection 7/84
Applicability: All models 550 with unit numbers 0002 to 0488 equipped with nitrogen bottles manufactured by H.T.L. Part Number 9912103-3.
Document: Cessna Citation Service Letter SL550-32-24. Compliance: Before further flight after 31 July 1984.
Background: An inspection is required to ensure that an adequate clearance exists at the nitrogen bottle operating lever which might otherwise prevent activation.