AD/CESSNA 400/91 - Elevator Bellcrank Bracket Integrity
1AD/CESSNA 400/91 - Elevator Bellcrank Bracket Integrity
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/CESSNA 400/91 - Elevator Bellcrank Bracket Integrity.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Cessna 400 Series Aeroplanes
AD/CESSNA 400/91 Elevator Bellcrank Bracket Integrity 12/86
Applicability: Model 441 S/No.s 0001 to 0355.
Requirement: Action in accordance with Cessna Service Bulletin CQB86-13.
Compliance: Within 100 hours time in service after 31 December 1986 or at the next scheduled inspection for Maintenance Release after 31 December 1986 whichever is the later.
Background: The manufacturer advises that there have been instances of rivet failure.