CTHRepealedLegislation
AD/CESSNA 400/74 - Fuel Pressure Switch Line - Inspection and Modification - CANCELLED
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
AD/CESSNA 400/74 - Fuel Pressure Switch Line - Inspection and Modification - CANCELLED
Start here
Turn the raw legal text into a practical explanation grounded in AD/CESSNA 400/74 - Fuel Pressure Switch Line - Inspection and Modification - CANCELLED.
| AD/CESSNA 400/74 | Fuel Pressure Switch Line - Inspectionand Modification | 10/2008 |
|---|
| Requirement: | CANCELLED. |
|---|---|
| This AD is cancelled on 25 September 2008. | |
| Background: | This unique Australian AD, issued in 1980, required modification to the support for the fuel pressure switch line in accordance with Cessna SIL ME 80-23. The AD compliance was within 50 hours time in service after 13 August 1980. As all aircraft would have now been modified, the AD is no longer required. |
Image unavailable in extracted text
James Coyne
Delegate of the Civil Aviation Safety Authority
25 July 2008