Step 1: Confirm applicability. Determine whether the aircraft is a Cessna 400 series (excluding models 404 and 441). Then determine whether the lower forward carry‑through spar fitting on either wing is a J&R Aerospace part JRA‑445‑1. This requires checking maintenance records, purchase invoices, or physically examining the part number on the fitting (likely visible with an inspection panel removed). If the part is not J&R, the AD does not apply, but the owner should document the part number for audit purposes.
Step 2: Determine the fitting’s accumulated time in service as at 31 August 2017 (the commencement date). This is the total hours and calendar years from when the fitting was first installed on any aircraft. If the fitting was installed new on that date, the time is zero. If it was installed used, the owner must trace its prior service hours. If records are incomplete, the owner must make a reasonable estimate or treat the fitting as having exceeded the threshold to avoid under‑compliance risk.
Step 3: Calculate the initial compliance deadline.
- If accumulated time < 1000 hours and < 3 years: inspect before either 1000 hours or 3 years is reached (whichever first).
- If accumulated time >= 1000 hours or >= 3 years (or both): inspect within 220 hours or 12 months after 31 August 2017, whichever first.
Record this deadline in the aircraft’s maintenance tracking system.
Step 4: Arrange the inspection. Book the aircraft into an appropriately rated maintenance organisation or LAME. Ensure the following are available:
, Inspection panels removed: per Cessna Service Kit SK421‑152 or other suitable access means (remove interior trim, panels, etc., to expose the fitting area).
, Figure A from the AD for reference (a hard copy or clear digital version).
, Cessna IPC 53‑40‑00, page 4, Figure 01, item 169, to identify exact fitting location.
, Borescope (recommended even if not strictly mandated; the AD permits its use).
, Standard inspection tools (light, mirror, magnifying glass if needed).
Step 5: Perform the visual inspection per the requirement. Look over the whole visible area of the fitting on both wings. Pay particular attention to the inboard end for crack initiation (as shown by arrow in Figure A). Look for corrosion pitting over the whole visible surface. Do not remove primer. If any area is obscured and cannot be seen adequately, use a borescope. Document what was seen , even if nothing was found, note the areas inspected and any limitations (e.g., “primer intact, no cracks or corrosion pitting identified using borescope aid”).
Step 6: Record compliance. Enter into the aircraft maintenance log the AD number (AD/CESSNA 400/120), the date of inspection, the component time since new and since last inspection, the person performing the inspection (licence number), and the result. If cracks or pitting are found, also record the location and size, and then consult the airworthiness regulations for the required remedial action , likely replacement of the fitting with an approved OEM part or an approved repair scheme. Do not release the aircraft to service until the defect is resolved.
Step 7: Schedule the repetitive inspection. Set a reminder for either 1000 hours or 3 calendar years from the current inspection date, whichever occurs first. Note that if the SIDS task is already on a similar calendar, align them only if the SIDS interval is equal or shorter; if the SIDS interval is longer, the AD’s interval must be followed independently. Many aircraft tracking software packages allow you to set a custom “AD” task.
Step 8: Maintain records for the life of the aircraft. The AD does not expire, so each subsequent 1000‑hour or 3‑year cycle requires a repeat. Keep all AD compliance records in the permanent aircraft log.
Step 9: If in doubt, contact CASA. If there is any ambiguity about the fitting identification, the starting time, or the inspection method, an operator may submit a written request for clarification to CASA’s Airworthiness Directives section. This is slow but safer than guessing.
Cost estimate for a typical owner. Assuming a LAME charges $150 per hour labour, and the inspection takes 2‑4 hours to remove panels, inspect, and reinstall (dependent on access difficulty), plus a borescope fee ($50‑100 rental), and possibly a facility fee, the compliance cost per cycle is approximately $350‑700 plus GST per aircraft. This is modest but recurrent. For a fleet of, say, five affected aircraft, the cost is $1,750‑3,500 per year if the calendar interval is the binding one.
If the fitting is found cracked, the additional cost of obtaining a replacement OEM fitting (likely discontinued or expensive) plus installation labour could easily exceed $10,000 per wing. For an older Cessna 402 with a market value of $50,000‑100,000, that cost could economically write off the aircraft. The AD therefore carries a significant tail risk for owners of lower‑value aircraft.