AD/CESSNA 207/29 - Rear Wing Spar Doubler
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
View image in the official source Cessna 207 Series Aeroplanes
AD/CESSNA 207/29 Rear Wing Spar Doubler 8/85
Applicability: All model 207 with S/Nos 20700001 to 20700767 (1969 to 1983).
(Normally aspirated and turbocharged models which have had a rear wing spar replaced with one shipped from Cessna Supply Division).
Requirement: Action in accordance with Cessna S.B. SEB 85-9.
Compliance: Within 100 hours time in service after 31 August 1985 or at the next scheduled inspection for Maintenance Release issue after 31 August 1985 whichever is the later.
Background: The manufacturer suspects that a quantity of spare rear wing spar assemblies may have been shipped from the Cessna Supply Division without a doubler installed near the attach fitting.