Follow the Directive’s three requirements in the sequence and timing it prescribes, using SB05-24-01 dated 31 January 2005 as the procedural reference unless an FAA-approved AMOC to FAA AD 2005-13-10 provides an acceptable later revision.
Step 1 , Confirm applicability:
- Verify the aeroplane model and serial number against the Directive’s applicability list: Model 206H serial numbers 20608195 through 20608223, 20608225 and 20608226; and T206H serial numbers T20608410 through T20608475, T20608477 through T20608501, T20608503 and T20608506. Only aeroplanes with those serial numbers fall within the AD as written.
Step 2 , Identify the junction box installation:
- Locate and confirm the main electrical power junction box installation code and part number. The AD directs inspection of MC01-3A I.C. 9 (P/N S3100-297) and MC01-3A I.C. 10 (P/N S3100-344) junction boxes. Confirm that the junction box on the aeroplane is one of those two installations and that the part number matches before proceeding.
Step 3 , Perform the inspection (Requirement 1):
- Within 30 days after the Directive’s effective date (1 September 2005), or sooner if scheduled, inspect the identified junction box for any incorrect amperage circuit breaker installed in place of the required 40-amp circuit breakers. The Directive requires the inspection to be performed "in accordance with Cessna Service Bulletin SB05-24-01 dated 31 January 2005." Apply the SB’s inspection steps precisely. If the inspection was already accomplished prior to the effective date, the AD’s qualifier "Unless already accomplished" means no further inspection is mandated by this AD, provided the prior action corresponds to the SB requirements.
Step 4 , Replace incorrect breakers (Requirement 2):
- If the Requirement 1 inspection identifies any incorrect amp circuit breaker, replace the incorrect breaker with the specified 40-amp circuit breaker. Replacement must be done "in accordance with SB05-24-01." The AD requires this to be completed "Before further flight after the Requirement 1 inspection," which means do not release the aeroplane to fly until replacement and any required post-replacement checks in the SB are completed.
Step 5 , Control spares (Requirement 3):
- From the AD’s effective date, only 40-amp circuit breakers may be installed as spares in any MC01-3A I.C. 9 or MC01-3A I.C. 10 main electrical power junction box. Ensure spare parts stock and maintenance ordering systems are updated to prevent installation of non-40-amp breakers as spares for those junction boxes.
Step 6 , Consider alternate service bulletin revisions:
- If using a later revision of SB05-24-01, confirm that the FAA has approved that revision as an AMOC to FAA AD 2005-13-10. The Directive explicitly accepts FAA-approved AMOCs to FAA AD 2005-13-10 as acceptable for compliance with the equivalent Requirements of this Directive. Do not rely on a later SB revision unless it has that FAA-approved AMOC status as described in the AD.
Step 7 , Operational planning and parts procurement:
- Given Requirement 2’s "before further flight" restriction, plan inspections at times when parts and maintenance resources are readily available to avoid grounding aircraft unnecessarily. Ensure procurement of the correct 40-amp circuit breakers and verification of part numbers so that replacements meet the SB’s specification.
Step 8 , Record-keeping and evidence:
- Although the AD does not prescribe record-keeping steps, standard maintenance practice is to document inspections and component replacements in the aircraft maintenance records and logbooks. Retain documentation showing the inspection was done in accordance with SB05-24-01 (or an FAA-approved SB revision), and that any replacements were to the specified 40-amp circuit breaker. This documentation will be relevant if evidence of compliance is later required by CASA or other authorities.
Step 9 , Liaise with regulator if uncertain:
- If there is uncertainty about whether a particular SB revision is acceptable as an AMOC, or about the interpretation of the AD’s requirements, seek clarification from CASA, referencing the AD text’s allowance for FAA-approved AMOCs to FAA AD 2005-13-10. The AD itself does not detail the process for CASA acceptance of AMOCs; operators should secure written confirmation if relying on an alternate compliance method.
Following these steps aligns maintenance action with the Directive’s explicit textual requirements: inspect within 30 days (unless already done), replace incorrect breakers before flight, and restrict spares to 40-amp devices, all performed in accordance with SB05-24-01 as required or via an FAA-approved AMOC to FAA AD 2005-13-10 where applicable. The AD becomes effective on 1 September 2005; schedule actions accordingly.